My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-009
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 12:45:19 PM
Creation date
7/6/2023 12:38:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/05/1999
Control Number
1999-009
Subject
Contract Documents & Specifications for Wabasso Causeway Park
Beautification Project. Arozoza Brothers
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
View images
View plain text
BID PROPOSAL <br />INDIAN RIVER COUNTY <br />WABASSO CAUSEWAY PARK <br />BEAUTIFICATION PROJECT <br />IRC BID ##9034 <br />COUNTY PROJECT ##9623 <br />AMOTJt. BROTHERS CORPORATION <br />(Bidder's Name) <br />(Bidder's Address) <br />to furnish and deliver all materials and to do and perform all work in accordance with the Contract <br />Documents <br />TO Purchasing Department <br />Indian River County <br />2625 19th Avenue <br />Vero Beach, FL 329601 <br />Gentlemen: <br />Thu undersigned oidder Ids carefully vyalliined the Coniraci Documents and the site Of the WOM <br />and is familiar with the nature and extent of the work and any local conditions that may in any <br />manner affect the work to be done, and the equipment, materials and labor required. <br />The undersigned agrees to do all the work and furnish all materials called for by said plans and <br />specifications, in the manner prescribed therein, in accordance with the Contract Documents and <br />to the standards of quality and performance established by the County, for the unit prices stated <br />in the spaces herein provided, for each of the items or combination of items stipulated. It is <br />understood that certain quantities shown in the schedule are approximate only, subject to <br />increase or decrease and for the purpose of bid comparisons for determination of low Bidder. It <br />is further understood that payment will be in accordance with quantities placed in the construction <br />as more specifically provided in the Instruction to Bidders and Technical Specifications included <br />as Dart of the Contrnnt Dnmirni-ntt <br />1. To do any extra work, not covered by the above schedule of prices, which may be ordered <br />by the Engineer upon authorization by the County Commission, and to accept as full <br />compensation therefore such prices as may be agreed upon in writing by the F=ngineer and <br />the Contractor in accordance with General Conditions. <br />Within ten (10) days from the date of acceptance of this proposal, to exec. a tllpe <br />C,)ntract and to fumish Inc ian# River Cour>,# a erten i �a oN]d it arm arnautit eaual <br />0 1 5° of the contract p-rice_rrlri a f gYItiersi Bid in an ar un equal L 'i000 of the <br />ontract price, The Contractor shall provide two (2) separate bonds, a combined <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).