Laserfiche WebLink
1-1 <br />40 <br />40 <br />INSTRUCTIONS TO BIDDERS <br />IPMMM <br />Terms used in these Instructions to Bidders which are defined in the General <br />Conditions have the meanings assigned to them in the General Conditions. The term <br />"Successful Bidder" means the lowest, qualified, responsible Bidder to whom Owner <br />(on the basis of Owner's evaluation as hereinafter provided) mares an award, <br />Nllle� • y . - Mr ,A M, <br />2.1. Complete sets of the Bidding Documents in the number and for the deposit <br />sum, if any, stated in the Advertisement or Invitation may be obtained from <br />Engineer (unless another issuing office is designated in the Advertisement or <br />Invitations to Bid). <br />2.2. Complete sets of Bidding Documents shall be used in preparing Bids; neither <br />Owner nor Engineer assume any responsibility for errors or misinterpretations <br />resulting from the use of incomplete sets of Bidding Documents. <br />2.3. Owner and Engineer in making copies of Bidding Documents available on the <br />above terms do so only for the purpose of obtaining Bids on the Work and do <br />not confer a license or grant for any other use. <br />3. Qualifications of Bidders. <br />3.1 To demonstrate qualifications to perform the Work, each Bidder must be <br />prepared to submit within five days of Owner's written request, an audited <br />financial statement, a list of major pieces of construction equipment owned by <br />the Bidder and documentation demonstrating the Bidder's compliance with the <br />qualifications listed below: <br />a. Bidder must have at least five years' experience in the construction of <br />similar projects of this size and larder. <br />b. Bidder must have successfully constructed, as prime CONTRACTOR, <br />at least three projects similar in scrape to this project. <br />C. Bidder must have good recommendations from at least three clients <br />similar to the OWNER. <br />d. The Bidder's superintendent and assistants must be qualified and <br />experienced in similar projects in all categories. <br />e. Bidder must be able to provide evidence of authority to conduct <br />business in the jurisdiction in which the project is located. <br />3.2 The OWNER reserves the right to reject bids from Bidders that are unable to <br />meet the listed required qualifications. <br />4. Exarsin�2f.Qo c c 7 s d to <br />4.1. Before submitting a Bid, each Bidder must (a) examine the Contract Documents <br />thoroughly; (b) visit the site to familiarize himself with local conditions that may <br />INSTRUCTIONS TO BIDDERS <br />rq _ I <br />