My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-009
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 12:45:19 PM
Creation date
7/6/2023 12:38:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/05/1999
Control Number
1999-009
Subject
Contract Documents & Specifications for Wabasso Causeway Park
Beautification Project. Arozoza Brothers
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />equipment and the operations of workers to the Project site and land and areas identified <br />in and permitted by the Contract Documents and other land and areas permitted by Laws <br />and Regulations, rights-of-way, permits and easements, and shall not unreasonably <br />encumber the premises with construction equipment or other materials or equipment. The <br />CONTRACTOR shall take all precautions to minimize inconvenience to residents Living <br />adjacent to the construction site by maintaining access to driveways and providing noise <br />control devices for dewatering equipment. CONTRACTOR shall assume full responsibility <br />for any damage to any such land or area, or to the owner or occupant thereof or of any <br />land or areas contiguous thereto, resulting from the performance of the Work. Should any <br />claim be made against OWNER or ENGINEER by any such owner or occupant because <br />of the performance of the Work, CONTRACTOR shall promptly attempt to settle with such <br />other party by agreement or otherwise resolve the claim by arbitration or at law. <br />CONTRACTOR shall to the fullest extent permitted by Laws and Regulations indemnify <br />and hold OWNER and ENGINEER harmless from and against all claims, damages, losses <br />and expenses (including, but not limited to, fees of engineers, architects, attorneys and <br />other professionals and court and arbitration costs) arising directly, indirectly or <br />consequentially out of any action, legal or equitable, brought by any such other party <br />against OWNER or ENGINEER to the extent based on a claim arising out of <br />CONTRACTOR'S performance of the Work. <br />6.20 During the progress of the Work, CONTRACTOR shall keep the premises free from <br />accumulations of waste materials, rubbish and other debris resulting from the Work. At <br />the completion of the Work CONTRACTOR shall remove all waste materials, rubbish and <br />debris from and about the premises as well as all tools, appliances, construction <br />equipment and machinery, and surplus materials, and shall leave the site clean and ready <br />for occupancy by OWNER. CONTRACTOR shall restore to original condition all property <br />not designed for alteratinn by the Contract Documents. <br />6.21 CONTRACTOR shall not load nor permit any part of any structure to be loaded in any <br />manner that will endanger the structure, nor shall CONTRACTOR subject any part of the <br />Work or adjacent property to stresses or pressures that will endanger it. <br />Record Documents: <br />6.22 CONTRACTOR shall maintain in a safe place at the site one (1) record copy of all <br />Drawings, Specifications, Addenda, Written Amendments, reviewed Shop Drawings, <br />Change Orders, Work Directive Changes, Field Orders and written interpretations and <br />clarifications (issued pursuant to paragraph 9.4) in good order and annotated to show all <br />changes made during construction. These record documents together with all reviewed <br />samples and counterpart of all reviewed Shop Drawings will be available to ENGINEER <br />for reference. Upon completion of the Work, these record documents, samples and Shop <br />Drawings will be delivered to ENGINEER for OWNER. Upon delivery of such documents <br />+ J <br />incE�r p,, _^ c�riucn ...rtificatun, :yi"d and ucte <br />t;���l`r'D, ►w,c rir"NrRitu1. �iv <br />u, <br />that all documents accurately and completely reflect all deviations from or changes in the <br />original Contract Documents made during construction of the project. <br />6.23 These requirements also supplement those of Article 14, Record documents shall be up- <br />to-date and available for review by the resident project representative prior to each <br />application for progress payment. Payment will not be made for construction of items not <br />shown on the record documents. <br />6.24 Not less than two percent (2%) of the contract price shall be retained until correct record � <br />drawings, specifications, addenda, modifications and shop drawings are delivered to and <br />reviewed by the ENGINEER. <br />GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.