My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-009
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 12:45:19 PM
Creation date
7/6/2023 12:38:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/05/1999
Control Number
1999-009
Subject
Contract Documents & Specifications for Wabasso Causeway Park
Beautification Project. Arozoza Brothers
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />4W <br />0 <br />a <br />9.15 ENGINEER will not be responsible for CONTRACTOR's means, methods, techniques, <br />sequences or procedures of construction, or the safety precautions and programs incident <br />thereto, and ENGINEER will not be responsible for CONTRACTOR's failure to perform or <br />furnish the Work in accordance with the Contract Documents. <br />9.16 ENGINEER will not be responsible for the acts or omissions of CONTRACTOR or of any <br />Subcontractor, any Supplier, or of any other person or organization performing or <br />furnishing any of the Work. <br />ARTICLE i0 - CHANGES IN THE 1Naf3�. <br />10.1 Without invalidating the Agreement and without notice to any surety, OWNER may, at any <br />time or from time to time, givon written order of additions, deletions or revisions in the <br />m <br />Work as it ay find necessary or desirable. These will be authorized by a Written <br />Amendment, a Change Order, or a Work Directive Change. Upon receipt of any such <br />document, CONTRACTOR shall promptly proceed with the Work involved which will be <br />performed under the applicable conditions of the Contract Documents (except as otherwise <br />specifically provided). <br />10.2 If OWNER and CONTRACTOR are unable to agree as to the extent, if any, of an increase <br />or decrease in the Contract Price or an extension or shortening of the Contract Time that <br />should be allowed as a result of a Work Directive {Change, a claim may be made therefor <br />as provided in Article 11 or Article 12. <br />10.3 CONTRACTOR shall not be entitled to an increase in the Contract Price or an extension <br />G11 '-',a Contract Time with respect to any Work performed that is not required by the <br />Contract Documents as amended, modified and supplemented as provided in paragraphs <br />3.4 and 3.5, except in the case of an emergency as provided in paragraph 6.27 and except <br />in the case of uncovering Wnrk as provided in paragraph 13.9. <br />10.4 OWNER and CONTRACTOR shall execute appropriate Change Orders (or Written <br />Amendments) covering: <br />1€3.4.1 changes in the Work which are ordered by OWNER pursuant to paragraph <br />10.1, are required because of acceptance of defective Work under <br />paragraph 13.13 or correcting defective Work under paragraph 13.14, or are <br />agreed to by the parties; <br />10.4.2 changes in the Contract Price or Contract Time which are agreed to by the <br />parties; and <br />..t.h V A . 4t-- .. .L...4............ <br />changes in the Contract Price or C.vnit aul T irne wii uc e� wc)Uy �� V QuW04a11Ut;; <br />of any written decision rendered by ENGINEER pursuant to paragraph 9.11; <br />provided that, in lieu of executing any such Change Order, an appeal may be taken from <br />any such decision in accordance with the provisions of the Contract Dccuments and <br />applicable Laws and Regulations, but during any such appeal, CONTRACTOR shall carry <br />on the Work and adhere to the progress schedule as provided in paragraph 5.35. <br />10.5 If notice of any change affecting the general scope of the Work or the provisions of the <br />Contract Documents (including, but not limited to, Contract Price or Contract Time) is <br />required by the provisions of any Bond to be given to a surety, the giving of any suvh <br />notice will be CONTRACTOR's responsibility, and the amount of each applicable Bond will <br />be adjusted accordingly. <br />GENERAL CONDMONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.