Laserfiche WebLink
i <br />s <br />• <br />O <br />and applied uniformly throughout the analysis. The results of the computation, by <br />planning sector, are provided in Tables 12 through 15. The assumed <br />renourishment interval is eight (8) years. The quality of the sand source(s) <br />utilized for construction, the extent of storm activity following construction, <br />construction sequencing of adjacent sector restoration and renourishments, and <br />the maintenance or remedial adjustment to the constructed shore protection <br />structures in Sector 7 will all influence the required renourishment interval. It is <br />assumed that construction of Sectors 1, 2 and 3 will occur in fiscal year 2000- <br />2001 and that Sectors 5 and 7 will occur in fiscal year 2002-2003. <br />When projected over a 30 -year horizon, the present value of all restoration and <br />renourishment costs for improvements to Sectors 1, 2, 3, 5 and 7, Inclusive, is <br />approximately $44,143,203. It must be noted that these figures presented in <br />Table 16 and above are exclusive of sand source investigation, hardbottom <br />mapping and characterization, project performance monitoring, and mitigatior; <br />costs. <br />