Laserfiche WebLink
ab <br />• <br />0 <br />TABLE 14 <br />30 -YEAR COST PROJECTIONS FOR INDIAN RIMER COUNTY BEACH <br />PROJECTS (BY SECTOR) <br />Nounsnment Volume <br />10 -Year Storm Loss <br />Annual Erosion <br />Total loss <br />Unit Cost <br />Renourishment Interval = <br />Sector Length = <br />BEACHFIL.L <br />construction <br />Design and Permitting <br />Construction <br />Design and Permitting <br />Construction <br />Design and Permitting <br />�� � <br />n 1. <br />Construction <br />Design and Permitting ` <br />nSub usal Sand Cost <br />Total Reach Cost <br />Initial Reach Cost <br />Initial Reach Cost (Present) <br />9G -f Af98.98Pfrb1 Z -5G WK4! 121598CHCRML <br />17.4 <br />cy/ft <br />2.9 <br />cy/ft <br />40,6 <br />cy/fk <br />$7.25 <br />per cy <br />8 <br />years <br />11,684 <br />feet <br />G`,ast <br />E <br />Yr ar (n �Fta <br />$3,915,000 <br />4 <br />3% <br />$3,478,427 <br />$391,500 <br />3 <br />3% <br />$358,278 <br />$1,965,249 <br />12 <br />3% <br />$1,378,386 <br />$196 525 <br />11 <br />3% <br />$141,974 <br />$1,965,249 <br />20 <br />3% <br />$1,088,111 <br />$196,525 <br />19 <br />3% <br />$112,075 <br />$1,965,249' <br />28 <br />3% <br />$858,965 <br />$196,525 <br />27 <br />3% <br />$88,473 <br />$10,791,821 <br />$7,sm,698 <br />$10,791,821 $7,504,688 <br />$4,306,500 <br />$3,836,705 <br />