My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-028
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 4:22:23 PM
Creation date
7/6/2023 4:21:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Proposal
Approved Date
01/26/1999
Control Number
1999-028
Subject
Sole Source Proposals - Johnson Controls. Indian River County Courthouse
Controls upgrade & improvements to existing Chiller Plant Controls
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />• <br />JAN 18 '99 10:12AM JOHNSON CONTROLS INC. <br />J HNSON PROPOSAL <br />CONMLS <br />TO: <br />Indian River County Government <br />1820 28th Street <br />P.2 <br />Johnson Controls, Inc. <br />Systems and Services Division <br />4433 Parkbreeze Court <br />Orlando, FL 32808 <br />Tel.; 407/291 1971 <br />FAX: 4071290 6699 <br />gLp - ©moi 8 <br />DATE: 1-113-1999 <br />PROJECT: Indian River Courthouse <br />Vero Beach, FL 32980 Metasys Upgrades <br />ATTN: Mr, Lynn Williams Proposal ORL99-011 <br />Superintendent of Buildings and Grounds <br />Johnson Controls is pleased to provide the following quotation per your request. <br />1. Courtroom CO2 and Occupancy Sensor Programming: Provide labor and material to improve <br />control of outdoor air supplied to seven court rooms at the Indian River County Courthouse. <br />These upgrades Include providing CO2 sensors, occupancy sensors, programming of sensors into <br />existing Metasys Facility Management System, and commissioning. <br />As requested, Indian River will complete all electrical work including sensor mounting in the court <br />rooms, running electrical wires, and wiring the sensors. I have specifically excluded this from the <br />estimate. <br />2. Improve Chiller Control and SeA4e3cina; Provide evaluation and programming to existing <br />chiller plant controls and make-up air unit in order to improve operation and potentially improve <br />utility costs. Changes to chiller sequencing aro accomplished by rewriting Graphical Programming <br />Language (GPL) and testing chiller operation. <br />3. Persgn-Machine Interface (PMI) Software Subscription One year PMI software subscription is <br />provided to the existing Operator Work Station (OWS). Software is uploaded and configured. <br />Revisions are year 2000 compliant. <br />Total cost for the Indian River Courthouse controls upgrade and improvements to the <br />existing chiller plant controls Is $14,668.00 (Fourteen Thousand, Six Hundred sixty-eight <br />Dollars). <br />4. In completing this estimate I have used service rates agreed upon in the Indian River Sole <br />Source Agreement. I have applied the discount multiplier of •4276 to all Johnson Controls parts. <br />(IMPORTANT: This proposal incorporates by reference the terms and conditions on the reverse <br />side hereof,) <br />This <br />� ���� proposal is Hereby accepted and Tfiis proposal is valid until __ <br />Johnson Controls I.,authoozed to February 30, 1999 <br />proceed with the work; subject, however, T <br />to credit approval by Johnson Controls, Inc,, <br />Milwaukee, Wisconsin. <br />urc auyr — p any NaHe <br />Signstu e <br />NameKEftNSfi!i R- MAGi <br />Title:� CHAIRMAN <br />Date: --=6l'? --- -- - — - <br />JOHNSON CONTROLS, INC. <br />�Slgnatu <br />Name: <br />Title: __Account Maansuar <br />
The URL can be used to link to this page
Your browser does not support the video tag.