My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-039
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2023 10:57:38 AM
Creation date
7/10/2023 10:57:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/09/1999
Control Number
1999-039
Subject
Contracts between IRC & ZEP Construction
CR 512 Bridge Replacement Project/Park Lateral Canal & Lateral AU@ Canal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'-vw�j s.u4: �vw itv�__.. lU-ygl2ii'!'I`9d7 <br />P-02 <br />�A008"06%ft� EXHIBIT" A" <br />_ 7rD �" nNTQT P1 Tr''T'TC)N INC <br />4riA_,1L O.i 4.J 1 i \.J 1 1 i%-1 ---1 i i v s 4 7 ii 1 4i • <br />7802 lean Boulevard <br />Ft. hlyers, FL 33912 <br />Telephone (941) 267.8778 <br />Fax (941) 267-7907 <br />Jimmy 26, 1999 <br />Mr. Jim Davis, P.R. <br />Public Works Director <br />Indian River County <br />1840 251h Street <br />'Hero Beach, Fl. 32960 <br />Re: CR512 Bridge Replacement Project <br />Part 1 Agreement -- Preliminary Site Plan Development <br />Exhibit A— Basle Professional Fees <br />Dear Mr. Davis: <br />The ZEP Construction, Inc. design/build team is pl.-rased to submit our Fee for <br />the Part 1 Agreement for this project. The total Lu alp Sum Fee for this phase <br />is $40,600.00, which includes Zep Construction, K.imley-Horn and Associates <br />(Engineer) and Dunkclberger Bagineering and Testing (Geotechnical). This <br />lump sum fee also includes all expenses associated with this Part I <br />Agreement. We arc looking forward to starting this project for Indian River <br />County and as you are aware have already set up meetings with Fellsmere <br />Farms Water Control District, Sun Ag and the City of Fellsmere which are <br />scheduled for January 27, 1999 to keep this project moving. <br />If you have any questions or need additional information please contact me at <br />(941) 267-5778. <br />Sin�cer�el�y_, <br />7ovan Zepeevski, P.E. <br />President <br />-99 19:53 RECEIVED FROM:551 £363 8175 <br />P.02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.