Laserfiche WebLink
3) Department of Environmental Protection. <br />4) U.S. Army Corps of Engineers. <br />5) St. Johns River Water Management District. <br />410 6) US EPA NPDES Permit <br />All permit applications will be prepared for the COUNTY'S <br />signature. <br />0 g. Establish centerline tied to existing recoverable section monuments. <br />h. Review submittals shall be made in writing to Indian River County, <br />0 Director of Public Works, requesting review of the submittal. Three <br />(3) complete copies of the submittal including all plans, calculations, <br />specifications, and other supporting information shall be delivered to <br />the Director of Public Works for each review submittal. One (1) of <br />these sets shall be a reduced set on 11" x 17", or 8'/2" x 14" media. <br />i. Define the scope of work for soils testing and coordinate soils <br />investigation, and supply, under basic compensation, a geotechnical <br />soils investigation for each bridge. <br />H. Construction Phase <br />The DESIGN/BUILDER will supply to the COUNTY a Performance Bond in the <br />amount of 125% and a Payment Bond in the amount of 100% of the constriction <br />cost prior to commencement of construction. The DESIGN/BUILDER shall <br />constrict two complete bridges, ready for use, in accordance with plans and <br />specifications approved by the County, including maintenance of traffic, <br />mobilization, removal and disposal of existing bridges, and all incidental work. <br />Material testing shall be performed in accordance with DOT standards.. <br />SECTION V - TIME FOR COMPLETION <br />The time for completion of each project phase shall be as follows: <br />Preliminary Site Plan Development 45 calendar days <br />Final Design & Permitting Shall be as per <br />Construction Phase Part II Agreement <br />Commencement dates shall be established in a "Notice to Proceed" from the COUNTY for each <br />phase. <br />SECTION VI - COMPENSATION <br />The COUNTY agrees to pay and the DESIGNBUILDER agrees to accept for services <br />rendered pursuant to this Agreement fees in accordance with the following• <br />1. Professional Services Fee <br />a. The basic compensation for the Preliminary Site Plan Development phase <br />.shall be in accordance with the attached Exhibit "ti 15a51C PiOIeSSlonal <br />Fees. <br />b. After approval by the COUNTY of the Preliminary Site Plan Development <br />phase, the fee for future phases will be included in an amendment to this <br />Contract. <br />The fee for each Phase includes services performed by the structural ergincer, enviromnenta! <br />specialist, civil engineer, and all related disciplines. Travel costs shall be under basic compensation <br />to and from Indian River County. Any travel reimbursement must be authorized as Additional Work <br />7 <br />