My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-046
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 9:00:16 AM
Creation date
7/12/2023 8:59:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
02/16/1999
Control Number
1999-046
Subject
US Army Corps of Engineers Permit/
Indian River County Shooting Range
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
46 <br />Permittee: INDIAN RIVER COUNTY <br />Permit No: 19904098(IP-IS) <br />Page 5 <br />4. Reliance on Applicant's Data: The determination of this <br />office that issuance of this permit is not contrary to the public <br />interest was made in reliance on the information you provided. <br />5. Reevaluation of Permit Decision: This office may reevaluate <br />its decision on this permit at any time the circumstances warrant. <br />Circumstances that could require a reevaluation include, but are <br />not limited to, the following: <br />a. You fail to comply with the terms and conditions of this <br />permit. <br />b. The information provided by you in support of your permit <br />application proves to have been false, incomplete, or <br />inaccurate (see 4 above). <br />c. Significant new information surfaces which this office did <br />not consider in reaching the original public interest <br />decision. <br />Such a reevaluation may result in a determination that it is <br />appropriate to use the suspension, modification, and revocation <br />procedures contained in 33 CFR 325.7 or enforcement procedures <br />such as those contained in 33 CFR 326.4 and 325.5. The referenced <br />enforcement procedures provide for the issuance of an <br />administrative order requiring you comply with the terms and <br />conditions of your permit and for the initiation of legal action <br />where appropriate. you will be required to pay for any corrective <br />measures ordered by this office, and if you fail to comply with <br />such directive, this office may in certain situations (such as <br />those specified in 33 CFR 209.170) accomplish the corrective <br />measures by contract or otherwise and bill you for the cost. <br />6. Extensions: General Condition 1 establishes a time limit for <br />the completion of the activity authorized by this permit. Unless <br />there are circumstances requiring either a prompt completion of <br />the authorized activity or a reevaluation of the public interest <br />decision, the Corps will normally give favorable consideration to <br />a request fnr an extension of this time limit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.