Laserfiche WebLink
O <br />i <br />4. EXAMINATION OF CONTRACT DOCUMENTS AND SITE <br />4.1 It is the responsibility of each Bidder, before submitting a bid, to (a) <br />examine the Contract Documents thoroughly, (b) visit the site to become <br />familiar with local conditions that may affect cost progress, performance, <br />or furnishing of the work, (c) consider federal, state, and local laws and <br />regulations that may affect costs, progress, performance, or furnishing of <br />the work, (d) study and carefully correlate Bidder's observations with the <br />Contract Documents, and (e) notify Engineer of all conflicts, errors, or <br />discrepancies in the Contract Documents. <br />4.2 Reference is made to the Supplementary Conditions for identification of: <br />4.2.1 Those reports of explorations and tests of subsurface conditions at <br />the site which have been utilirA:d by Engineer in preparation of the <br />Contract Documents. Bidder may rely upon the accuracy of the <br />technical data contained in such reports, but not upon non-technical <br />data, interpretations, or opinions contained therein or for the <br />completeness thereof the purposes of bidding or construction. <br />To obtain access to the site, the following shall be contacted: <br />Michael C. Hotchkiss, P.E. Environmental Engin <br />Project work site is located within the Cherrywood Estates <br />subdivision road right-of-ways, ( 59`" Avenue) south of Cherry <br />Lane (33`d Street), as shown on the construction plans. <br />4.2.2 Those drawings of physical conditions in relation to existing surface <br />and subsurface conditions (except underground facilities) which are <br />at or contiguous to the site which have been utilizer) by Engineer in <br />preparation of the Contract Documents. Bidder may rely upon the <br />accuracy of the technical data contained in such drawings, but not <br />upon the completeness thereof for the purposes of bidding or <br />construction. Copies of such reports and drawings will be made <br />available by Owner to any Bidder on request. Those reports and <br />drawings are not part of the Contract Documents, but the technical <br />data container) therein upon which Bidder is entitled to rely as <br />provided in Paragraphs 4.2.1 and 4.2.2 are incorporated therein by <br />reference. Such technical data has been identified and established in <br />the Supplementary Conditions. <br />t14100-2 <br />