Laserfiche WebLink
G-1 <br />i <br />WORK DIRECTIVE CEIAl+iG'E <br />(Instructions on reverse side) No. <br />PROJECT:DATE OF ISSUANCE: <br />OWNER: <br />(Name, <br />Address) <br />CONTRACTOR: OWNER`s Project No. <br />ENGINEER: <br />CONTRACT FOR: ENGINEER's Project No. <br />You are directed to proceed promptly with the following change(s)'- <br />Description: <br />hange(s):Description: <br />Purpose of Work Directive Change: <br />Attachments. (list documents supporting change) <br />if a claim is made that the above change(s) have affected Contract Price or Contract Time, <br />any claim for a Change Order based thereon will involve one of the following :methods of <br />determining the effect of the change(s). <br />Method of determining change in <br />Method of determining change in <br />Contract Price: <br />Contract Time: - <br />0 Time and materials <br />❑ Contractor's records <br />❑ Unit prices <br />❑ Engineer's records <br />❑ Cost-plus fixed fee <br />❑ Other <br />❑ Other <br />Estimated increase (decrease) in Contract <br />Estimated increase (decrease) in Contract <br />days. If the change <br />Price: <br />If the change involves an increase, the esti.. <br />Time: <br />Y+ involves an increase, the cstiirlMed ti- i-- <br />to be exceeded without further autho- <br />smated <br />matedamount is not io be `xceeded with- <br />not <br />out further authorization. <br />rization. <br />(RECOMMENDED: <br />by <br />F_JCDC No. 1910.8-F ( 1993 F.diti in) <br />A4J-THORIZED: <br />by <br />a:iaed cf,errl 0 Arnelb:1. <br />