Laserfiche WebLink
C-1 <br />4 <br />r -n <br />1 tc responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, creat. utilities, <br />insurance and warranties shall be as Follows: <br />RESPONSIBILITIES; <br />OWNED: <br />CONTRACTOR. <br />The following documents arc attached to and made a part of this Certificate: <br />This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release <br />of CONTRACTOR's obligation to complete the Work in accordance with (tic Contract Documents. <br />Executed by ENGINEER on .................... l9 ............ <br />....................•••• ............................,......... <br />ENOME:R <br />By.................................. I ................... I...... <br />CONTRACTOR accepts this Certificate of Substantial Completion on .................................... 14 ............. <br />COPiTRhCvcif <br />By........................... a. ....... .................. <br />OWNERaccepts this Certificate of Substantial Completion on ............................................ 14 ............. <br />.......................I...........I............... <br />GwNt:R <br />By.......................................... ............... <br />