My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-049
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 10:10:37 AM
Creation date
7/12/2023 9:54:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
02/16/1999
Control Number
1999-049
Entity Name
Driveways Inc.
Subject
Cherrywood Estates Water Expansion Project# 98-05-DS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6706.050 <br />12. Completion: <br />a. Before ENGINEER Issues a Certificate of Substantial Completion, submit <br />to CONTRACTOR a list of observed items requiring completion or <br />correction. <br />b. Conduct final inspection in the company of ENGINEER, OWNER and <br />CONTRACTOR and prepare a final list of items to be completed or <br />corrected. <br />c. Verify that all Items on final list have been completed or corrected and <br />make recommendations to ENGINEER concerning acceptance. <br />C. LIMITATIONS OF AUTHORITY <br />Except upon written Instructions of ENGINEER, Resident Project <br />Representative: <br />1. Shall not authorize any deviation from the -Contract Documents or approve <br />any substitute materials or equipment. <br />2. Shall not exceed limitations on ENGINEER'S authority as set forth In the <br />Contract Documents. <br />3. Shall not undertake any of the responsibilities of CONTRACTOR, <br />Subcontractors or CONTRACTOR'S superintendent, or expedite the Work. <br />4. Shall not advise on or issue directions relative to any aspect of the means, <br />methods, techniques, sequences or procedures of construction unless such is <br />specifically called for In the Contract Documents. <br />5. Shall not advise on or issue directions as to safety precautions and programs <br />in connection with the Work. <br />6. Shall not authorize OWNER to occupy the-1'r0ject in whole or in part.. <br />7. Shall not participate in specialized field or laboratory tests. <br />END OF SECTION <br />00800-42 <br />2121195 <br />
The URL can be used to link to this page
Your browser does not support the video tag.