Laserfiche WebLink
4B <br />40 <br />(UGC01201.FMT):aa <br />SECTION 01201 <br />PRECONSTRUCTION CONFERENCE <br />PART 1 - GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. Engineer shall schedule and administer the <br />preconstruction conference and shall perform the <br />following duties: <br />1. Prepare agenda for meeting.. <br />2. Give notice of meeting three days in advance <br />of meeting date. <br />3. Make physical arrangements for meeting. <br />4. Preside at meeting. <br />5. Record the minutes which shall include all <br />significant proceedings and decisions. <br />6. Reproduce and distribute copies of minutes <br />within fifteen (15) working days after <br />meeting. Minutes shall be distributed to all <br />participants in the meeting and to all parties <br />affected by decisions made at the meeting. <br />1.02 RELATED REQUIREMENTS <br />A. Section 01000: Description of Work. <br />B. Section 01311: Construction Schedule. <br />C. Section 01.340: Shop Drawings, Product Data and <br />Samples. <br />D. Section 01720: Project Record Documents. <br />E. Section 01730: Operating and Maintenance Data. <br />1.03 PRECONSTRUCTION CONFERENCE <br />A. Engineer will schedule meeting with Contractor, <br />Owner and other affected parties. <br />B. Location of the preconstruction meeting; the <br />project site or a nearby office to be scloctt-1 by <br />Owner/Engineer. <br />01201-1 <br />