My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-049
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 10:10:37 AM
Creation date
7/12/2023 9:54:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
02/16/1999
Control Number
1999-049
Entity Name
Driveways Inc.
Subject
Cherrywood Estates Water Expansion Project# 98-05-DS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4P <br />r, <br />1. U4 PRODUCT DATA <br />A. ]Preparation: <br />1. Clearly mark each copy to identify applicable <br />+ ,products, models, options, and other data. <br />2. Show performance characteristics and <br />capacities. <br />3. Show dimensions and clearances required. <br />4. show wiring or piping diagrams and controls. <br />B. Manufacturer's standard schematic drawings and <br />diagrams: <br />1. Modify drawings and diagrams to delete <br />information which is not applicable to the <br />work. <br />2. Supplement standard information to provide: <br />information specifically applicable to the <br />work. <br />3. Include. manufacturer's installation <br />instructions when required by the <br />' specifications Section. <br />1 . t15 SAMPLES <br />+ A. office Samples: Limit to items requiring color, <br />pattern and similar selections and shall be <br />sufficient size and quantity to clearly illustrate: <br />1. Full range of color, texture and pattern <br />2. Submit samples for selection of finishes <br />within sixty (60) days after date of <br />Agreement, or when directed by Engineer <br />B. Field Samples and Mock -Ups: <br />1. Functional characteristics of the product, <br />with integrally -related parts and attachment <br />devices <br />2. Contractor shall erect, at the Project Site, <br />at a location acceptable to the Engineer <br />3. Size of Area: that specified in the <br />respective specification section <br />4. Fabricate each sample and mockup complete and <br />finished <br />5. include identification on each sample, giving <br />full information <br />G. Remove samples at conclusion of Work, or when <br />acceptable to the Engineer <br />01340-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.