Laserfiche WebLink
4D <br />40 <br />(UGC41510.FMT):aa <br />SECTION 01510 <br />TEMPORARY UTILITIES <br />01510--1 <br />PART 1 - <br />GENERAL <br />1.01 <br />REQUIREMENTS INCLUDED <br />A. Furnish, install, and maintain temporary utilities <br />required for construction; remove on completion of <br />entire project. <br />S. Provide temperature, ventilation, and lighting <br />requirements, if applicable, as specified in each <br />individual section. <br />1.02 <br />RELATED REQUIREMENTS <br />Section 01000. Summary of Work <br />1.03 <br />REQUIREMENTS OF REGULATORY AGENCIES <br />A. Comply with National Electric Code.. <br />B. Comply with federal, state, and Local codes and <br />regulations, and with utility company requirements. <br />PART 2 - <br />PRODUC'T'S <br />2.01 <br />MATERIALS (GENERAL) <br />Materials may be new or used, but must be adequate in <br />capacity for the required usage. They MUST NQT create <br />unsafe conditions, and JIUST NOT violate requirements of <br />applicable codes and standards. <br />2.02 <br />TEMPORARY ELECTRICITY AND LIGHTING <br />A. The Contractor must maintain power to all existing <br />buildings and areas. <br />B. The Contractor is responsible for providing and <br />paying for all power required for his operations. <br />Contractor shall make arrangements with Owner for <br />temporary power. <br />01510--1 <br />