My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-049
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 10:10:37 AM
Creation date
7/12/2023 9:54:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
02/16/1999
Control Number
1999-049
Entity Name
Driveways Inc.
Subject
Cherrywood Estates Water Expansion Project# 98-05-DS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4D <br />40 <br />(UGC41510.FMT):aa <br />SECTION 01510 <br />TEMPORARY UTILITIES <br />01510--1 <br />PART 1 - <br />GENERAL <br />1.01 <br />REQUIREMENTS INCLUDED <br />A. Furnish, install, and maintain temporary utilities <br />required for construction; remove on completion of <br />entire project. <br />S. Provide temperature, ventilation, and lighting <br />requirements, if applicable, as specified in each <br />individual section. <br />1.02 <br />RELATED REQUIREMENTS <br />Section 01000. Summary of Work <br />1.03 <br />REQUIREMENTS OF REGULATORY AGENCIES <br />A. Comply with National Electric Code.. <br />B. Comply with federal, state, and Local codes and <br />regulations, and with utility company requirements. <br />PART 2 - <br />PRODUC'T'S <br />2.01 <br />MATERIALS (GENERAL) <br />Materials may be new or used, but must be adequate in <br />capacity for the required usage. They MUST NQT create <br />unsafe conditions, and JIUST NOT violate requirements of <br />applicable codes and standards. <br />2.02 <br />TEMPORARY ELECTRICITY AND LIGHTING <br />A. The Contractor must maintain power to all existing <br />buildings and areas. <br />B. The Contractor is responsible for providing and <br />paying for all power required for his operations. <br />Contractor shall make arrangements with Owner for <br />temporary power. <br />01510--1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.