My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-049
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 10:10:37 AM
Creation date
7/12/2023 9:54:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
02/16/1999
Control Number
1999-049
Entity Name
Driveways Inc.
Subject
Cherrywood Estates Water Expansion Project# 98-05-DS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-1 <br />i <br />D. For exterior utility work (such as underground <br />pipelines, roadwaysservice less areas, etc tlythese <br />e <br />shall be cleaned daily. Not <br />than <br />once weekly. Roadways shall be mechanically <br />broomed. <br />3,02 DUST CONTROL <br />A. General Contractor shall broom -clean interior <br />spaces prior to the start of completing painting <br />and continue cleaning on an as -needed basis until <br />painting is finished. <br />B. Schedule operations so that dust and other <br />contaminants resulting from the cleaning process <br />will not fall on wet or newly -coated surfaces. <br />3.03 FINAL CLEANING <br />A. Remove grease, mastic, adhesives, dust, dirt, <br />stains, fingerprints, labels, and other foreign <br />materials. <br />B. Contractor shall broom -clean paved surface.; <br />rake -clean other surfaces of the grounds. <br />C. Prior to final completion, Contractor shall conduct <br />art inspection of all work areas to verify that the <br />entire work area is clean. <br />I 1 <br />END OF sm,rioN <br />0171©-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.