Laserfiche WebLink
C-1 <br />r <br />C) From 3A i calendar days to 45 calendar days from the et%ctive date of Notice to <br />Proewd, the CONTRACTOR shall complete the following tasks: <br />1. Clean up project area. <br />2. Remove all eTiipment and material from project site. <br />3. Perform contract close-out procedures. <br />Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute Final <br />Completion. <br />6. The following documents are attached to and made a condition of this Bid: <br />(a) Schedule of Bid hews. <br />(b) wired Bid Security in the form of Insurance. <br />7. Communications concerning this Bid shall be addressed to: <br />Michael C. Hotchkiss, P.I . <br />Environownta�l Engineer <br />(551) 770-5321 <br />Ilie address of Bidder indicated below is as follows: <br />Driveways. lnc. <br />3300 Bobbi Lane <br />Titusville, F1 32780 <br />9. The tarts used in this Bid which are defined in the General Condidions of the <br />Construction Contract include as part of the Contract Documents have the <br />meanings assigned to them in the General Conditions. <br />SUBNfI d'ED ON February 2, 1999 <br />e 00310- <br />