Laserfiche WebLink
40 <br />40 <br />} 7.5 CONTRACTOR has correlated the results of all such # <br />observations, examinations, investigations, <br />explorations, tests, reports and studies with the terms <br />and conditions of the Contract Documents. <br />7..6 CONTRACTOR has given ENGINEER written notice of all <br />conflicts, errors or discrepancies that he has <br />discovered in the Contract Documents and the written <br />resolution thereof by ENGINEER is acceptable to <br />CONTRACTOR. <br />Article 8.CONTRACT DOCUMENTS. <br />The Contract Documents which comprise the entire agreement between <br />OWNER and CONTRACTOR concerning the work consist of the following: <br />8.1 This Agreement (Section 00530). <br />8,2 Performance and other bonds (Sections 00610 and 00620), <br />8.3 Notice of Award and Notice to Proceed. <br />8.4 General Conditions ('Section 00700), <br />8.5 Supplementary Conditions (Section 00800). <br />8.6 Specifications bearing the title CHERRYWOOD <br />ESTATES WATER ASSESSMENT PROJECT as listed in <br />the table of contents hereof. <br />8.7 Drawings, inclusive with each sheet bearing <br />the following general title: <br />CHERRYWOOD ESTATES WATER ASSESSMENT PROJECT <br />8.8 Addenda numbers 1 to 1, inclusive. <br />8.9 CONTRACTOR's Rid (Section 00310). <br />8.10 Indian River County Water and Wastewater <br />Utility Standards, <br />8.11 The following, which may be delivered or issued after <br />the effective date of the Agreement and are not attached <br />hereto: All written amendments and other dc—lments <br />amending, modifying, or supplementing the Contract <br />Documents pursuant to Paragraphs 3.4 and 3.5 of the <br />General Conditions. <br />FA -6 <br />