My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-049
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 10:10:37 AM
Creation date
7/12/2023 9:54:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
02/16/1999
Control Number
1999-049
Entity Name
Driveways Inc.
Subject
Cherrywood Estates Water Expansion Project# 98-05-DS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />rcquircd to provide suFh coverage, and a Chang' Orda slut# <br />be issued to adjust the Cootr= Priec acrnrdin=hy. <br />11Pm! Uelivaid++ ��'mF+�^ inrturmer: <br />5.15. If OWNER finds it necessary to occupy of use a <br />portion orport'oons of the Wont pri orto Substantial Completion <br />of all the Wn rk. such use or occupancy may be aocwrctplislaed in <br />accotadancc with paragraph 14.10: provided that no such use or <br />occupm,cy shall cor ntcnce before the inturcri providing the <br />propcsty irlstmuwc have ackttawlcriged tw6ce thereof and in <br />waiting clfectcd any changes in coverage meessitated thereby. <br />The imu ren providing the property insrnancc shall coascia by <br />endoraemcnt on the policy or policies. but the propaiv insur <br />irlee stroll not be candled or permitted to lapse on aunt of <br />any such partial use of occupancy <br />AR11CLE 6•—CONTRACTOR'S RESPONSIBILITIES <br />Superritiou and Superrrsttrtd— e- <br />6.1. CONTRACfORshall supervise impectand direct thc <br />Work competently and efficiently, devoting such attention <br />thereto and applying such skills and cxpenise as may he <br />noct&sary to perfam, the Work in accorisrv,« with the Con. <br />tr,a Documents. CONTRACTOR shall be solely responsible <br />for the means methods. techniques. sequcncm znd procedures <br />of constriction. but CONTRACTOR shall not be responsible <br />for the negligence of others in the dcsign or spa:iricarion of a <br />specific ntrsns, method. technique, sequence or procedure of <br />construction which is shown or indicated in artd expressly <br />required by Use Cnnu= Documcats. CONTRAC 0R shall be <br />raponnirlr, to see that the completed Work complies accu- <br />rately with the Contract Documents. <br />6.2. CONTRACMR shads keep on Elie Work at all times <br />during its progress a Competent resident superintendent. Who <br />shill not be replaced without written notice to OWNER and <br />ENGINEER rxoept under extraordinary enct=tances. the <br />superintendcnt will be CONTRAC'MR's representative at the <br />site and shall have authority to act on behalf of CONIRAC- <br />TOR. All eommunicalions to the superintendent shall be as <br />binding as if given to CONTRA=R. <br />%era . Ma urudt raid Eq WBIRrrir_ <br />6.3. CONTPACTORshall provide competent.s111ULWygt:al- <br />ificd penaniel to survey. hay taut and construct the Work as <br />required by the Conuart. Documents. CONTRACTOR shalt at <br />all ehmes mairlWn good discipline and order u the sire. Exccpt <br />as othcrwisc roquirrd for the safety or proEovion of persons or <br />Elie Work or pmperty at the site or adjacent thcrrw. and exec pt <br />as otherwise `rrtdicated in the Contract Documents. aft Work at <br />the site shahl t� performed during rr?ularwofkiDf hours amt <br />4:t]t1TRAG Lift will tsar {emit overtime work or the pctfor. <br />mance of Work an Saturday. Sunday or any legal holiday <br />without OWNER'S written consent given after prior written <br />notice to ENGINEER. <br />6.4. Unless otherwise specifsed in the General Requim. <br />mens. CONTRACTOR shall furnish and assttmc full rcsport. <br />slbility for all mawria- equipnsertt. tabor. --portuion, coir <br />strncoon equip W— and )'. tools. apphiutces, Roel. <br />power, light. heat. telephone. water. sanitary Faci;s'tim tcmpo- <br />rare facrli6cs and all other facilitics and incklentals nary <br />for the furnishhrtr. pctforsrr =. testing, start-up and comple- <br />tion of the We it <br />6S. All materials and cguipasenc sludl be of goW quality <br />and new. except as otherwise provided In Idle Contract Doerr <br />ments. All warranties Anel gttuaatrxs spacifiraslly rallad far by <br />the 5peafttsstions shalt expressly ma to the bawfitafOWNFR. <br />If mps4rd by ENGINEER. COIR shalt furnish <br />satisfactory evidence (including reports of tcquired tests) as to <br />the kind and quality of rttucriah and egtapalcrtt. All rtsueaials <br />and equipmeait shall be applied. installed. corutected. erected. <br />used. cleaned and conditioned in acsaaWW= with instn-io- <br />of the apocabi, Supphser. except as odx,,*ise provided in the <br />Contract Documents. <br />Pragror 5chaLuls: <br />6.6. CONTY{AGTOR shat! adhere w aha progress sghrduk <br />established in acaordattce with paragraph 2.9 as it 'nay be <br />adjusted from titne to dntc as provided below' <br />6.6.1. CONTRACTOR shall submit to ENGINEER for <br />acccp=ce tto the extent indicated in paragraph 2.9) Pro- <br />posed adjastmenls in tiff prows schedule. that. Will not <br />change idle Contract Times for Milestones). Such: adjttst- <br />menu will cartfocm generally to the pnrgnesz scttedule then <br />in effect and additionally will comply vmh any provisions of <br />the General, RequiremcAS applicable therrw. <br />6.6.2. Prod o adjustments in the progress Sehedule <br />that will change the Contract Times for Milestoncsl shalt be <br />submined in accordance -idi iherquirr.tt-rttsof p-'rnr�'ph <br />12.1. suet, adjustments nay only be made lQy x a"— <br />Orderor Written Antendrnent in accordance with Araiele 1''_ <br />6.7. Subsdairrr out "Or*Equar' Bens: <br />6.7.1. Whenever Jul item of maWrW or caul by using <br />specified or deacribcd in the Contract Dccurn tnrenr is <br />die mane of a propricury item or the UJUDC of IS partkAllar <br />Supplier. the speeifiearion of description is 4rcr'ed to <br />establish the type. function atoll quality required. Unless the <br />specification or dcsaipLion contains a is followeed by we'rds <br />reading than no like.. cgvivalent or "or -equal•• item $r no <br />substitution is permitted. other items of rmz -tial or cqu,v <br />ment or material or equipment of other Suppliers tMy be <br />accepted by E NG I N EER u nd er t he fotlowi Ill" <br />
The URL can be used to link to this page
Your browser does not support the video tag.