Laserfiche WebLink
CI <br />• <br />the PMjcct •,vhich are,ppli-ble during the perfOtnranec of the <br />!York. <br />the of Prrmuxs: <br />6.16. CONTRACTOR shall confine construction equip. <br />mt, the storage of materials and equipment and the opera• <br />at <br />ed in and <br />Batts of workers to rile site andritifi <br />'CUM AM arras <br />permitted by rhs e Contract Docu thenand <br />permitted by laws and Regulations. rights -of --y' Perth <br />easements. and Shull not Unreasonably encumber the premises <br />with construction equipincrtt or other materials or equipment. <br />CONTRACTOR shill assume full responsibility for any dam- <br />age to any Such lased or arc& or to the Owner or occupant <br />thereof Or of any Sdiacent land or arras. Mulling from the <br />performance of the Wolk. Should any claim be made by any <br />such owner or occupant because of the performance of the <br />Wort. CONTRACiOR•sh" promptly scale with such other <br />party by negotiation Or otherwise nesolve the claim by arbiva- <br />tion or 'other dispute resolution proceedins or at law. CON - <br />TRACTOR Shall. to the fuliest extent permitted by Laws and <br />Regutadons. indemnify and hold hartracss OWNER. ENGI- <br />NEER. ENGINEER's Consultant and anyone directly or <br />indirtcmly employed by any of them from and tent all claims. <br />costs, losses and danta Tea arising out of or resultittt from any <br />ctaitn or action, legal or equitable, brought by any such owner <br />or occupant against OWNER. ENGINEER or any other party <br />indemnified ircrettndcr to the extern caused by or based upon <br />CONTRACTOWS ttcrfornnanee of the Wort:. <br />6.17. During the progress of the Work- CONTRAsrTt:]R <br />Shall keep the premises free from accumulations of wase <br />materials, rubbish ardother debris rtsuitingfrom rhe Work. At <br />the completion of the Work CON'litACTOR shall remove all <br />waste materials. rubbish and debris from and about the pre- <br />mises as well as all tools. appliances. construction equipment <br />wed machinery and surplus materials. CONTRACTOR shall <br />leave the site cleats and t=dv for occupancy by OWNER at <br />Substantial Completion of the Work. CONTRAMR shall <br />restore to original condition all prppeny not designated for <br />alteraijon by the Conti= DOCurocnu. <br />6.18. CONTRAC:7OtT shall not load nor pmrin any "t �f <br />any stntcture to be loaded in any manner that will endanger the <br />the <br />structure. nor shall CONTRACTOR subject any Pa <br />t Of Work or adjacent property to stresses or pressures that will <br />cndangcr it. <br />Record Docvlments: <br />she Work. these record documents• S amplcs and Shop Draw. <br />ings will be delivered to ENGINEER forOWNER. <br />5afrry amf Prwcrdan: <br />6.M. CONTfRAMR shall be responsible for initisdng. <br />maintaining and supervising all safety pmeauSrons and pro- <br />grams in connection with trite Work. CONTRACTOR stall take <br />all ncets$M prrcautiom% for the safety of. and shall provide <br />the necessary protection to ptevcnt damage. injury or loss to: <br />6.'fl.l. all persons on the Work site or who may be <br />affected by the W(rk: <br />6 20_^. all the Work and materials and equipment to be <br />incorporated therein• whether in storage on Or Of the site.- <br />and <br />ite:and <br />8.19. CO1siTrA+G'IOR shill maintain in a save place at the <br />sive erns rUaord copy of all l]rawings. Specifications. Addenda. <br />Written AMcndmettta, Change Orders. Work Cfange Diree <br />rives.: weld Orden and written interpretations and clarifier• <br />tions tissued purwant to paragraph 9.41 in good order and <br />annotascd to show all changes made during construction. <br />these record docurrmcnts together with all appruvod Samples <br />end a crktntcrpart of all approved Shop fltawumf's will h^ <br />. , .r. <br />I., trvw rci rr yr lI+ N, r,nr, (trt.tm Of <br />6.103, other property at the site or adjacent thereto. <br />including trees. shrubs. lawns, walks. pavements. roadways. <br />structures. utilities Sad Underground Facilities not deli;- <br />nated for removal. redoraiior or t eplacement in the a9urse of <br />construction, <br />CONTRACTOR shall comply with all applicable laws and <br />RgMlations of any public body haw"mg jutisdictian for suety Of <br />persons or property or to protect them from damage, ittjury or <br />lass: and shalt erect and maintain all <br />necessary nicguards for <br />such safety and pruteCliOt�n NN' RA R sof lnnotify s and <br />crs of adjacent Pro perty <br />utility owners when ptasccutron of the Work may affect them, <br />and stint eooperatc with [item in the protection. removal. <br />relocation and ieplacerrxnt Of their property. Alt damage. <br />injury or loss to any prtrpf_ny mfermd to in paragraph 6.20.1 or <br />6.303 caused. directly or indirectly. in whole Of irt P"A'kby <br />CONTRACMR. any Subcontractor. Stipp' rany <br />er <br />person or orFartiaation directly or indirectly employed by any <br />of them to perform Or furnish any of the Work or anyone for <br />vrttoise aets any Of them may be. liable. shall be temWied by <br />CONTRACTOR (except damage or loss aclaiWiable to the <br />tach of Drawings or SpecTi zsions or to the ants or omissions <br />of OWNCRO r ENGINEER or ENGINEER's Constiltant Of <br />nyn- <br />Inuhi by anv of them oranyonc fv whose sets any <br />of them may be ii..'r. and not sttrdbettlr. dimly or indi- <br />rertiy. in whole or in put, to the fardt or negligence of <br />MKTRA MR or any Subcontractor. Supplier or other per- <br />son Or orguuzation dircaly or indirectly employed by any of <br />rllcm). CONTRACTOR'S duties Sad respormbilities for safety <br />and for protection of the Wort[ shall continue until Such time IS <br />all the Work is complett.S and ENGINEER has issued a noucc <br />to OWNER and CONTRACTOR In asoondartce with para. <br />i <br />gs: ph 14.13 than 111c Work is acceptable [except is otherwse <br />expressly provided in connection with Substantial i-omplc- <br />tionl. <br />Sxtfra;r Rryrrun[�i•r: <br />8 I. CONTRACTOR stall dcsi-ate aqualified and cxpe- <br />rierttcsl safcry nurc'':,'a"''vc at the rnr whose duties and <br />