My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-049
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 10:10:37 AM
Creation date
7/12/2023 9:54:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
02/16/1999
Control Number
1999-049
Entity Name
Driveways Inc.
Subject
Cherrywood Estates Water Expansion Project# 98-05-DS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4D <br />6706--050 <br />4.2.1.3..1 'ENGINEER has relied upon the data obtained from <br />subsurface investigations made at the site in the form of <br />test borings. Such data is in the form of boring logs is <br />available, refer to Section 00200, information to 'Bidders, <br />for instructions on how to obtain this data. The locntifons <br />of the test borings are indicated on the Drawings. such <br />Jogs and samples are not part of the Contract Documents. <br />SC -"4.4 Contractor is responsible for measuring and <br />recording existing swale elevations at 1.00' intervals prior <br />to construction. Existing swale elevations shall be <br />maintained throughout construction. Contractor is also <br />responsible for preservation and/or replacement of any and <br />all existing permanent survey monumentation affected by <br />construction.. <br />Add a new paragraph immediately after 4.4 of the General <br />Conditions which is to read as follows! <br />4.4.1 ENGINEER may check the lines, elevations, reference <br />marks, batter boards, etc., set by CONTRACTORS, and <br />CONTRACTOR shall correct any errors disclosed by such a <br />check. Such a check shall not be considered as approval of <br />CONTRACTOR'S Work and shall not relieve CONTRACTOR of the <br />responsibility for accurate construction of the entire work. <br />CONTRACTOR shall furnish personnel to assist ENGINEER in <br />checking lines and grades. <br />ARTICLE 5. BONDS AND INSURANCE <br />SC -5.1 Delete the sentence of paragraph 5.1 of the General <br />Conditions in its entirety and insert in its place: "The <br />CONTRACTOR shall furnish a payment bond for 200 percent of <br />the total amount of the Did and a performance bond for 125 <br />percent of the Bid as security for the faithful performance <br />of all of the CONTRACTOR's obligations under the contract <br />documents. " <br />SC --5.4 The limits of liability for the insurance required <br />by paragraph 5.4 of the General Conditions shall provi>_3e <br />coverage for not less than the following amounts of greater <br />where require by law: <br />5.4.i and 5.a.2 workers' Compensation <br />(1) Workers' Compensation Statutory <br />(2) Employer's Liability $1,000,000 <br />00800--5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.