Laserfiche WebLink
C-1 <br />ib <br />SCOPE OF WORK AND PROJECT COSTING <br />Indian River County <br />Winter Recreational Beach User Survey <br />Task 1.0 Conduct Beach User Survey <br />This task is the actual collection of the recreational beach user data by <br />performing on-site beach surveys of beach goers. The survey's design will <br />allow the economists to evaluate recreational benefits per typical user and <br />allocate these benefits among specific user groups. This Winter Survey will <br />be used to more completely validate the data. It will also allow us to make <br />more up to date calculations of beach user counts. These surveys will be <br />conducted during the March through April period. The cost of the Winter <br />Survey includes seven (7) survey days along the beach nourishment project <br />areas within the Indian River Beaches. Costs include travel, overnight stays <br />and mileage, <br />Tran Task 1.0 Casts: $9,97 <br />Task 2.0 Evaluation and Interpretation of Beach user Survey <br />In this task Is beach survey data will be tabulated and a preliminary <br />recreational beach use survey report will be written and presented to the <br />appropriate County officials and Boards. This report will be used to validate <br />the Phase I survey and the data of the two reports may be combined. <br />Tota! Task 2.0 Costs. = $3,225 <br />Task 3.0 Revise Recreational Benefits and the 'Distribution of Benefits <br />Computation of the total recreational project benefits by Project Sector will <br />be developed based on the new survey data collected in this study. All <br />benefits will be revised based on the neva economic data and the adjusted <br />total distribution of recreational and storm protection benefits. These <br />benefits will be used to adjust the values presented in the Report Section 6. <br />Toil Task 3 O Cosrs. _ $3,750 <br />g9 3,M18.98bAV1N7fRfnyTSCfIF RVI I)IOWN <br />