Laserfiche WebLink
8600 Hidden f3"r <br />Suite $50 y <br />4 <br />Tamex <br />M-1 WITS] P us TIME re WV 2 <br />Position <br />Rat <br />rinci pa l -i n -Charge <br />$270 °`; <br />�, _ <br />(PIC) <br />eniorPrgectManager <br />$250 <br />3 <br />roject iVtanager <br />$225 <br />" <br />x <br />Senior Project Engineer <br />$225 <br />enior Professional Land Surveyor <br />$220 <br />"Project Engineer <br />$180 <br />Associate Engineer (FE) <br />$150 <br />raduate Engineer <br />$125 <br />CADD Designer <br />$125 <br />Engineering Associate <br />$115 " <br />Inspector <br />$115 <br />enior Technician <br />$110 <br />i <br />Surveyor Manager <br />$120 <br />i <br />E. <br />Survey Crew (2 Man) <br />$215` <br />" <br />Technician <br />$95 <br />s <br />Project Admin/Clerical <br />er D irect Costs; <br />consultant Cost +10 <br />A. <br />Sample Analysis: Cost + 10%' <br />a <br />� <br />d: <br />1 k <br />"rot <br />Auto/Truck Mileage: @Federal Rate <br />is <br />r=u <br />Field Truck: $100/Day <br />nfined Space Entry Truck and Safety Equipment: $150/Day <br />Reproduction, Printing, Shipping: @ <br />g, Cost <br />I <br />�.ft <br />