Laserfiche WebLink
0 <br />40 <br />l <br />Building Cost — Phase I <br />The total construction cost for Phase I is 521,050,614.00, or $109.65/SF <br />The total project cost for Phase I is 526,531,747.00, or $138.21/SF <br />Phase I <br />Administration Building <br />163,980 SF <br />@ 5 110 <br />= $ <br />18,037,800 <br />Purchasing/Buildings & Grounds/ <br />Probation Building <br />27,985 SF <br />@ $ 55 <br />$ <br />1,539,175 <br />Surface Parking <br />576 spaces <br />@ $ 750 <br />= $ <br />432,000 <br />Other Site Improvements/ <br />Demolition <br />10 acres <br />@ $ 75,000 <br />= $ <br />750,000 <br />Bridges Over Canal <br />2 each <br />0 5150,000 <br />= $ 300.000 <br />Subtotal <br />$ <br />21,058,975 <br />Savings of 2% on sales tax <br />(County purchased materials) <br />$ <br />- 421,118 <br />Subtotal <br />$ <br />20,637,857 <br />Escalation to Mid 1999 Const, Start <br />2% <br />412, 757 <br />Total Construction <br />$ <br />21,050,614 <br />Moveable Equipment & Furniture <br />$ <br />1,052,530 <br />(1/2 of FFE is existing to be reused) <br />5% <br />Land Acquisition <br />$ <br />850,000 <br />Design Fees, Surveys, Geotech <br />go/ <br />$ <br />1,894,555 <br />Permits, Inspections <br />3% <br />$ <br />631,518 <br />Owner Contingency <br />5% <br />$ <br />I,OS2.530 <br />Total Phase 1 <br />$ <br />26,531,747 <br />Executive Summary Page 4-1 <br />