Laserfiche WebLink
C-1 <br />r <br />2. EDACS TRUNKED SYSTEM VISUAL INSPECTION <br />Y2K runctional T%t Pmcedure Version: Rev. D <br />Last Modification Date: Ian 1 1998 <br />2.1 Visual inspection <br />Setup <br />Prior to the actual acceptance test, a physical inspection of the EDACS <br />equipment must be performed. The inspection for safety should include all <br />EDACS equipment areas. Any discrepancy 'which effects operator safety <br />must be corrected before the remaining tests are performed. If any hazard <br />is discovered, and existed prior to any modification, the customer must have <br />the hazard corrected before further tests are conducted. inspections for <br />quality workmanship are only necessary on equipment which was modified <br />or replaced. <br />Execution <br />1. Verify the area is clean and that all cabinets and racks are both clear <br />of debris and clean. <br />2. Verify all equipment racks are spaced per the drawings, secured and <br />grounded. <br />3. Verify all rack cables are dressed, secured and correctly marked. <br />4. Verify all nameplates and labels are in place. <br />5. Verify all protective foam, tape, and packing material has been <br />removed. <br />6. Verify all punchblocks are labeled. <br />Results (Pass/Fail) <br />Tester, <br />Date: <br />Comments: <br />TAT 5`sif <br />