• <br />4W <br />SECTION B <br />SPECIAL PROVISIONS <br />1.0 SCOPE <br />1.1 These Special Provisions shall supplement the General Conditions and shall govern <br />purchases by the County of Indian River under these Specifications, except that technical <br />specifications, if any, will govern if any conflict arises between such technical specifications <br />and these Special Provisions. <br />2.0 DESCRIPTION OF THE WORK/ALTERATIONS <br />2.1 The work for this project shall consist of furnishing all the necessary equipment, <br />materials and labor and transportation to eradicate nuisance vegetation, including, but not <br />limited to Brazilian pepper (Sehinus terebinthifolius) and Australian pine (Camiarina spp.) <br />from the property described in Exhibit B, via application of the herbicide Garlon(p in the form <br />of basil -bark spray treatment, and where appropriate, cut—stump treatment. <br />2.2 The Contractor shall be responsible for tate following: <br />2.2.1 Providing proof of licensing for Garlong herbicide application; <br />2.2.2 Obtaining all necessary State permits to apply Garton@ herbicide in an upland vegetation <br />community and in an aquatic environment, <br />2.2,3 Providing written certification within three (3) months of project completion that k 95% <br />of all nuisance invasive vegetation on both islands has been eradicated. <br />2.2.4 Performing semiannual follow up herbicide appli_ation, for a period of two (2) years; and <br />2.2.5 Submitting semiannual monitoring reports for a period of two (2) years. <br />2.3 Extra tvork: Without invalidating the contract, the OWNER may at any time, by written <br />change order and without preliminary notice to the surety, order extra work within the general <br />scope or alter the work by addition or reduction, and the contract price will be adjusted <br />accordingly. <br />2.4 Changes in tvork: The County shall have the right to suspend work wholly or in part for <br />such period or periods as may be deemed necessary due to unsuitable weather or other <br />conditions which the County considers unfavorable for the work to proceed. No allowance of <br />any kind will be made for such suspension of work except an equivalent time for completion of <br />lire contract. <br />2.5 Changed conditions: If during the progress of work, field conditions are found to differ <br />materially from those covered by the Specifications or from those which could reasonably have <br />been foreseen by the CONTRACTOR after examination of the site, the CONTRACTOR shall <br />call such conditions to the attention of the OWNER and necessary changes will be made to the <br />Specifications, if these changes entail extra work or materials and the value of such work has <br />not been determined by unit price under the contract, the values of such work or change shall <br />be determined by negotiation. The OWNER and CONTRACTOR shall execute a change order <br />to the contract at mutually satisfactory unit prices or lump warns for ally extra work, addition or <br />deletion made necessary by such changed conditions and requested by the County. <br />