Laserfiche WebLink
F <br />6,2 The bidder shall submit his bid on the form furnished along with all information indicated <br />on the form. Bids shall be in the units specified for each item. The bidder shall enter the <br />company name wherever the bid form so indicates, <br />6.3 Bids shall be opened and publicly read at the time and place indicated in the Invitation to <br />Bid. <br />7.0 CONS!<DERATION OF BIDS AND AWARD OF CONTRACT <br />7.1 The contract will be awarded to the lowest responsible and responsive bidder whose bid, <br />conforming to the specifications and/or instructions to bidder, will be the most advantageous to <br />The County, price and other factors considered. <br />7.2 OWNER reserves the right to award the contract to other than the law bidder for such <br />reasons as acceptability of specific products or designs, delivery times, warranties, past <br />performance, unacceptable deviations or exceptions taken to these specifications or degree of <br />compliance with any other requirement of these specifications. Further, OWNER shall have <br />the right to consider price, quality, time required for performance and qualifications of the <br />bidder in making the award. <br />7.3 The OWNER reserves the right to waive any and all irregularities and to reject any or all <br />bids in the best interest of the OWNER and award the contract to the responsible bidder whose <br />bid is determined to be in the best interest of the County. <br />7.4 If the contract is awarded, the OWNER will accept the bid and award the contract to the <br />successful bidder within sixty (60) days after the opening of the bids, by written notice to the <br />successful bidder. The award of the contract will be made to one CONTRACTOR only for all <br />work to be done. <br />7.5 Failure on the part of the successful bidder to execute a contract within fifteen (15) days <br />after the notice of acceptance shall be just cause for annulment of award. The OWNER may <br />then accept the bid of the next best evaluated bid or re -advertise for bid. <br />7.6 If the bid of the next bidder is accepted, this acceptance shall bind such bidder as though <br />he were the original successful bidder. <br />8.0 ACCEPTANCE OF OFFER <br />8] The signed bid shall be considered an offer on the part of the bidder; such offer shall be <br />deemed accepted upon completion of all steps in the purchasing process and issuance by the <br />County of contractual document. <br />9.0 PERFORMANCE <br />9.1 All material and parts shall be bid F.O.B. Destination, at thejob site. <br />9.2 The performance time may be a factor in the evaluation of the bid. The performance time <br />shall be defined as the anticipated time period expected to elapse between receipt of the <br />purchase order or execution of the contract and completion of the work. It is to be <br />emphasized that the meeting of specified performance schedules is a significant part of <br />ability to perform and that failure to meet such schedule may result in termination ol'the <br />contract and will surely be considered in the evaluation of future bids. <br />