Laserfiche WebLink
C� <br />ATTACHMENT B <br />SCOPE OF SERVICES <br />INDIAN RIVER COUNTY SOLID WAiSTV DISPOSAL DISTRICT <br />INDIAN RIVER C'OUNII' LANDFILL C'ONSTJ U(TION <br />OVERTIME EuNGINFJF 1tlNt; I.NS11J-HON SERVIC'E'S <br />'T'ask 100 - Overtime Engineering lnapcction Services <br />Additional on-site engineering construction inspection senices were performed during <br />overtime hours for the completion of the Indian River Landfill Infill Construction project <br />These tasks were required and included inspection of repairs made to the clay and tlse <br />synthetic liner, as well as weekend on-site inpections caused by the Contractor wheduling <br />work on the weekends <br />Hie construction Contract required the Contractor to pay tier all ovcrtimc required of the <br />I ripineer to perform inspection wrvrres This provision is stipulated in article 6, Section i 2 <br />CONTRACTOR shall rctimburse the ()'WA PR for additional enlyrreermg andeor <br />inspection costs incurred as a result of overtirrfc work in excess of the regular working <br />hours stipulated in Article SC -6 3 1 At OWNER's option, overtime costs may either <br />be deducted from the CONTRA(' l'OWs monthly payment request or deducted Front <br />the CONTRAC OR's retention prior to release of final payment Overtime costs for <br />the OWNE'R's personnel shall be based on the individual's current overtime wage rate <br />Overtime costs for personnel employed by the LNGINFI:R or OWNhR's independent <br />testing; laboratory shall be calculated in accordance with the terms of their respective <br />contracts with the OWNF-R <br />The Contractor, Waste Management Inc of I'Inrida, has reviewed these charges and has <br />acknowledged they are consistent with the contract requirements. The close out change <br />order for this project, which has been approved by the [bard of County Commissioners, <br />included the provision that these charges he deducted from the Contractor's final payment <br />Additional inspection services for Task 100 were incurred by CIM as a requirement for the <br />completion afthe Indian River Landfill Infill Construction project. This work OGUrred during <br />the period of construclion, January 1998 - February 1999. <br />S 1)n e'urlf0265mRJ <br />Rpil 33, JW9 B-1 <br />