My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-128
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 2:45:21 PM
Creation date
8/1/2023 2:44:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
05/04/1999
Control Number
1999-128
Entity Name
Camp Dresser & McKee Inc.
Subject
Full Cost Accounting Report/Solid Waste Services at IRC SWDD Landfill
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />O <br />The project limits shall be identified in individual work authorizations prepared by the <br />Engineer in conjunction with the Solid Waste Disposal District (SWDD) and approved by the <br />SWDD Board of Commissioners. Each work authorization will be sequentially numbered and <br />approved by the SWDD prior to a Notice to Proceed being issued. Groundwater monitoring for <br />closed landfills located in other areas of the county (exclusive of County landfill) is a service <br />excluded from this Agreement. <br />Basic services required of the ENGINEER for the project will be described in other <br />appropriate sections of this Agreement and in individual work authorizations. <br />SECTION II - SWDD OBLIGATIONS <br />The SWDD agrees to provide the following material, data, or services as required in <br />connection with the work to be performed under this Agreement: <br />A. Provide the ENGINEER with a copy of any related preliminary data or reports <br />available. <br />B. Provide the ENGINEER with all available drawings, surveys, right-of-way maps, <br />and other documents in the possession of the SWDD pertinent to the project. <br />C. The SWDD shall be responsible for acquiring all right-of-ways, easements, and <br />other rights in land as necessary to complete the project. <br />D. If new permit requirements are established by regulatory agencies after the date of <br />a work order affected by such permits, the SWDD shall be responsible for <br />obtaining those permits required to perform the work to complete the project. <br />E. The SWDD shall make all provisions for the ENGINEER to enter upon public or <br />private property as required far the ENGINEER to perform his services. <br />F. The SWDD will promptly review and approve all proper permit applications <br />necessary to expedite the acquisition of any local, state, or federal permits made <br />necessary by the project. <br />SECTION III - SCOPE OF SERVICES <br />The ENGINEER agrees to perform all necessary professional engineering and other <br />services in connection with the project as required and as set forth in the following: <br />roW423 <br />arm*,a <br />A. <br />1. The ENGINEER will endeavor not to duplicate any previous work done <br />on the project. Before issuance of a work order and written authorization <br />to proceed, the ENGINEER shall consult with the SWDD to clarify and <br />define the S WDUs requirements for the project and review all available <br />data. <br />
The URL can be used to link to this page
Your browser does not support the video tag.