Laserfiche WebLink
r/yf99 <br />r"127/"AGR)PWrXT08"Wwd <br />INDIAN RIVER COUNTY y 1 �� <br />CR512 BRIDGE REPLACEMENT PROJECTS <br />PROFESSIONAL ENGINEERINGIDESIGN <br />CONSTRUCTION SERVICES <br />DESIGNBUILD CONTRACT - PART 2 AGREEMENT <br />AMENDMENT #I -FINAL DESIGN, PERMITTING AND CONSTRUCTION <br />SECTION 1 - GENERAL <br />® THIS AMENDMENT #1 (also referred to as Part II Agreement), entered into this .�( — day <br />of Z f , 1999, by and between INDIAN RIVER COUNTY, a Political subdivision of the <br />State of Flo da, 1840 25th Street, Vero Beach, FL. 32960, hereinafter referred to as the COUNTY. <br />®) and ZEP CONSTRUCTION, INC., 7802 Jean Boulevard, Fort Myers, FL 33912, hereinafter <br />referred to as the DESIGNBUILDER., further describes the Scope of Work, guaranteed maximum <br />cost, and schedule for design/build services which were previously included in the DESIGN/BUILD <br />Contract dated February 9,1999. This amendment complements and adds to the original agreement. <br />SECTION I1- SCOPE OF WORK <br />The DESIGNBUILDER shall provide final professional engineering, construction, <br />permitting, and related services to the COUNTY for the INDIAN RIVER COUNTY CR512 <br />BRIDGE REPLACEMENT PROJECTS located west of the City of Fellsmere, as defined in the <br />attached Preliminary Design Development Program labeled Exhibit #1 dated April 23, 1999 as <br />prepared by Zep Construction, Inc. Exhibit #1 is hereby made a part of this Amendment. <br />SECTION III - MAXIMUM_ GUARANTEED COST <br />The DESIGNBUILDER shall perform all final roadway and bridge engineering, design, <br />drawings, preparation of material specification, meetings, permitting, utility coordination, bridge <br />construction, etc. for a maximum guaranteed cost of $805,000 for both bridges. In addition to the <br />bridge construction cost, this guaranteed price includes engineering for roadway and bridge designs <br />and plans, meetings, construction observation for the bridge only, permit fees, material testing for <br />the bridge only, test piles driving analysis and removing of the existing bridges within the <br />construction schedule time frame as described in Section 6 of Exhibit #l. The COUNTY is <br />responsible for reconstructing the approach roadways to the bridges along with its own field <br />observations and material testing. Therefore, the reconstruction of the road approaches is not part <br />of the maximum guaranteed price. <br />SECTION IV - PROJECT SCHEDULE <br />The project schedule shall be as described on page 13 of the Preliminary Design <br />Development Report (Exhibit #1) referred to in Section 2 above. <br />SECTION 1V - OTHER PROVISIONS <br />A. Receipt of an executed copy of this Amendment shall constitute the COUNTY's notice to <br />the CONSULTANT to proceed with the work. <br />B. All provisions of the AGREEMENT not specifically modified shall remain in full force and <br />effect. <br />This Amendment, regardless of where executed, shall be governed by and construed <br />according to the laws of the State of Florida. <br />1 <br />