My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-141
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2023 3:12:42 PM
Creation date
8/4/2023 3:12:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/11/2023
Control Number
2023-141
Agenda Item Number
8.Z.
Entity Name
Edlund, Dritenbas, Binkley Architects and Associates, P.A.
Subject
Architectural Services Amendment No.2 to Work Order No. 5 for architectural//Engineering
service for Fire Station #7
Project Number
IRC-1911
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCLUNC • DRITI"NBAS 31NKLEY <br />ARCHITECTS AND ASSQCIATESs R.A. <br />65 Royal Palm Pointe, Ste D <br />Vero Beach, FL 32960 <br />Ph: (772) 569-4320 Fax (772) 569-9208 <br />June 26, 2023 <br />TO: David Rattray <br />RE: IRC Station #7 Proposal for Additional Services <br />Comm. #050219VB <br />Dear David: <br />As per our meeting on June 22, 2023, the following revisions to completed construction <br />documents were requested: <br />1. Move PPE to facility storage and add a floor drain. <br />2. Move D -con to lawn equipment storage along with extractor and counter sink. Add a <br />floor drain. <br />3. Provide separate A/C system for D -con and PPE. <br />4. Provide eyewash in apparatus bay. <br />5. Add a man door in apparatus room, shift all three (3) overhead doors 8" to make room for <br />door. <br />6. Revise three (3) overhead doors on front to glass folding doors. <br />7. Add six (6) large ceiling fans to the apparatus room. <br />8. Take out the wall separating laundry and bunker gear, converting into one room. Move <br />AHU closet, ice machine, and washer/dryer to hall area. <br />9. Add access doors at new PPE and redesigned laundry, eliminate hallway #4. <br />10. Add two (2) floor drains to apparatus room. <br />11. Add shower in new D -con room. <br />12. Take out two (2) doors from apparatus room to restrooms. <br />13. Add nine (9) swing doors to nine dorm spaces. <br />14. Provide 1 -hour rated wall in hallway #I and #2 and add fire rated door to kitchen. <br />15. Add two (2) swing doors from two vestibule spaces to apparatus room. <br />16. Delete all two -headed emergency lights on interior to be revised to be within light <br />fixtures throughout. <br />
The URL can be used to link to this page
Your browser does not support the video tag.