My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-143
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2023 3:19:37 PM
Creation date
8/4/2023 3:18:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
07/11/2023
Control Number
2023-143
Agenda Item Number
8.AC.
Entity Name
Centerline, Inc.
Subject
First Amendment to West Wabasso Septic to Sewer Phase 3B Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRST AMENDMENT TO WEST WABASSO SEPTIC <br />TO SEWER PHASE 3B AGREEMENT <br />THIS FIRST AMENDMENT TO WEST WABASSO SEPTIC TO SEWER PHASE 3B <br />AGREEMENT ("First Amendment") is entered into as of the AP4' day of July, 2023 by and between Indian <br />River County, a political subdivision of the State of Florida, hereinafter referred to as the "OWNER", and <br />Centerline, Inc., hereinafter referred to as "CONTRACTOR". <br />RECITALS <br />WHEREAS, on September 13, 2022, OWNER and CONTRACTOR entered into the West <br />Wabasso Septic to Sewer Phase 3B Agreement "Agreement" for constructing a new gravity sanitary sewer <br />system to serve the West Wabasso areas generally along 58th Court and 591h Avenue south of CR 510; and <br />WHEREAS, OWNER and CONTRACTOR, due to time restraints under existing grants, desire to <br />amend the Agreement to include construction of a new gravity sanitary sewer system to serve the West <br />Wabasso areas generally along 61" Drive, north of CR 510 under the same price schedule, excluding <br />mobilization, demobilization and MOT, and the same timeline as set forth in the Agreement. <br />NOW THEREFORE, in consideration of the mutual undertakings herein and other good and <br />valuable consideration, the receipt and adequacy of which is hereby acknowledged, the parties agree, as <br />follows: <br />1. Recitals. The above recitals are true and correct and are incorporated herein. <br />2. Article 1 WORK amended. Article 1 WORK of the Agreement is hereby amended to add the <br />following: Construction of a new gravity sanitary sewer system to serve the West Wabasso areas <br />generally along 61' Drive, north of CR 510. The project will include approximately 150 LF of <br />roadway extension, 1,134 LF of gravity sewer main, 1,260 LF of sanitary force main, five <br />manholes; a lift station and related valves, fittings, laterals, services, and restoration of trenches <br />and roadway. Owner has assigned West Wabasso Phase 3A — Project ID (PID) 21.21.512A. <br />3. CONTRACT TIMES. The Work described in Section 2 above, will be performed under the same <br />Contract Times terms as set forth in the Agreement, but based on a substantial completion date 390 <br />days after the original substantial completion date (May 16, 2024) and 360 days after original final <br />completion date (June 15, 2024). <br />4. CONTRACT PRICE. The Contract Price for the work described in Section above will be in the <br />amount of $1,368,176.77. <br />5. All other provisions of the Agreement shall remain in full force and effect and those terms will <br />apply to the work described in Section 2 above. <br />IN WITNESS WHEREOF, OWNER and CONTRACTOR have executed this First Amendment <br />this rday of July, 2023. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.