Laserfiche WebLink
FIRST AMENDMENT TO WEST WABASSO SEPTIC <br />TO SEWER PHASE 3B AGREEMENT <br />THIS FIRST AMENDMENT TO WEST WABASSO SEPTIC TO SEWER PHASE 3B <br />AGREEMENT ("First Amendment") is entered into as of the AP4' day of July, 2023 by and between Indian <br />River County, a political subdivision of the State of Florida, hereinafter referred to as the "OWNER", and <br />Centerline, Inc., hereinafter referred to as "CONTRACTOR". <br />RECITALS <br />WHEREAS, on September 13, 2022, OWNER and CONTRACTOR entered into the West <br />Wabasso Septic to Sewer Phase 3B Agreement "Agreement" for constructing a new gravity sanitary sewer <br />system to serve the West Wabasso areas generally along 58th Court and 591h Avenue south of CR 510; and <br />WHEREAS, OWNER and CONTRACTOR, due to time restraints under existing grants, desire to <br />amend the Agreement to include construction of a new gravity sanitary sewer system to serve the West <br />Wabasso areas generally along 61" Drive, north of CR 510 under the same price schedule, excluding <br />mobilization, demobilization and MOT, and the same timeline as set forth in the Agreement. <br />NOW THEREFORE, in consideration of the mutual undertakings herein and other good and <br />valuable consideration, the receipt and adequacy of which is hereby acknowledged, the parties agree, as <br />follows: <br />1. Recitals. The above recitals are true and correct and are incorporated herein. <br />2. Article 1 WORK amended. Article 1 WORK of the Agreement is hereby amended to add the <br />following: Construction of a new gravity sanitary sewer system to serve the West Wabasso areas <br />generally along 61' Drive, north of CR 510. The project will include approximately 150 LF of <br />roadway extension, 1,134 LF of gravity sewer main, 1,260 LF of sanitary force main, five <br />manholes; a lift station and related valves, fittings, laterals, services, and restoration of trenches <br />and roadway. Owner has assigned West Wabasso Phase 3A — Project ID (PID) 21.21.512A. <br />3. CONTRACT TIMES. The Work described in Section 2 above, will be performed under the same <br />Contract Times terms as set forth in the Agreement, but based on a substantial completion date 390 <br />days after the original substantial completion date (May 16, 2024) and 360 days after original final <br />completion date (June 15, 2024). <br />4. CONTRACT PRICE. The Contract Price for the work described in Section above will be in the <br />amount of $1,368,176.77. <br />5. All other provisions of the Agreement shall remain in full force and effect and those terms will <br />apply to the work described in Section 2 above. <br />IN WITNESS WHEREOF, OWNER and CONTRACTOR have executed this First Amendment <br />this rday of July, 2023. <br />Page 1 of 2 <br />