My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-140
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2023 12:53:29 PM
Creation date
8/7/2023 12:51:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
05/11/1999
Control Number
1999-140
Entity Name
McCully Marine Services
Subject
Changer Order No. 1 for Artificial Reef Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 1996 - Febrxtary 1997 New Smyrna North Causeway Bridge <br />Working with Kirnmin's Corp. ror the Ulorida I)epf, ol—l'ransportalion' <br />transportation and deployment of the North C;auscway Bridge at New Smyrna Beach . The <br />reef site is 5.74 miles offslore of Ponce Inle[. Wlle11 cr)1111)fctcJ, aplhresxinntcl}' 8,000 inns <br />of concrete slabs and pilings were placed on V(,hlsi,1 CoulI ly Reef No, 5. 44437.0 <br />62019.5 <br />November 1, 1996 to November 25, 1996 FL. Power and Light - Martin Co, <br />'This second project sponsoreti by Florida Powerand Light and I\Nrtin Co. 4043.362 <br />tons of concrete slabs, Concrete rubble ranging in sirs from eight ton l,o(1lders to baseballs, <br />and some very large steel structures were loaded at the St. (.ache Power Plant and <br />transported offshore of the St. I..tlCle Inlet. Using large banes and tugs, the project was <br />accomplished in three loads to tnect the Thanksgivilhg deadline set by l lsl., '1'hc last anti <br />largest load was over 1,400 tolls and together witli a barge load Iaken Offshore of Volusla <br />Co. on the same day, McCulley iNtarine lalaced over 2,000 tons of reef material in a single <br />day. A record for us if not For file entire state. 2712.850 08002,035 <br />December 1996 - Volusia County <br />Cleaning, transportation, and deployment Of a 110 ft. X 30 ft. flat check Large <br />donated by Weeks Marine. The barge was brought down from Careen Cove Springs, I --I., <br />after cleaning and U.S Coast Guard inspections were complete. It -as then sunk without <br />explosives approximately 12 [Hiles offSliore Of Police Inlet. Alter Sinking, the (live team <br />reported that the barge rests " on dile bottotn, up6811t, And oil he numbers". 14,109.1 <br />61959.0 <br />April 1997 Pasco County 1997 Project <br />1,000 tons of Concrete culverts, pilings, and slabs were loaclai at the Florida power <br />Corp. Plant in <br />Holiday, Florida. Isroject was accornplishc(I in filar lrlr•gc loads and placed in <br />groups between existing army tanks.. <br />28:17:27.6N 83:01:14-2W 14274.7 45048.7 <br />May 1997 Hernando County 1997. <br />Over Boo tons of concrete culvert pipe donated I1y 1�Iorida Concrete Pipe Co. was <br />loaded at I•lernando Beach arxi transported offshore tc, the l3cndickson Rcet: <br />'Iihe project took four trips due to draft restrictions. C ulvcrls were placetl in trslils le.hclilig <br />from one army tank to another all(-)wlt <br />h} (livers lucre acress fn the existing; tanks. Ona clear <br />the tanks and culverts are visible j'rorn Ills sur!';lcc. <br />May 1997 Collier County Marco Island 2.5 Mile Ardf ficial lire£ Project <br />McCulley Marine furnisited over fill! trans trf crincrele r ul(c rte And sial+s to creole ;t <br />reef 2.5 miles offshore of march Islarul. <br />
The URL can be used to link to this page
Your browser does not support the video tag.