My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-140
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2023 12:53:29 PM
Creation date
8/7/2023 12:51:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
05/11/1999
Control Number
1999-140
Entity Name
McCully Marine Services
Subject
Changer Order No. 1 for Artificial Reef Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Donor of Material <br />Florida East Coast Railroad (FEC) <br />353 Florida Avenue <br />Ft. Pierce, FL. 33450-4362 <br />Bill Diehl(Supervisor) Phone: (800)342-1141 ext. 232.9 <br />Jon Andtou (Materials Supervisor) Prone: (84(})342-1131 ext. 5680 <br />(561)464-8276 <br />Mobile: (561)216-4110 <br />4. Berthing f=acilities: <br />Indian River Terminal <br />100 Terminal Drive <br />Fort Fierce, FL. 34950 <br />Bill Leshe' (General Manager) Phone: (561)465-7700 <br />FAX: (561) 465-7731 <br />Pager: (888)878-9549 <br />VI. DOCUMENTATION <br />The Contractor must retain, for a period of not less than three years foflowing the <br />completion of the project, all records, documents and papers relative to the work <br />performed on this project, and must provide access to all project records to allow <br />the .audit of any relevant' books, documents, and papers by the County and/or the <br />State of Florida within this period of time. <br />1111. TIME OF COMPLETION <br />A. Prosper placement of all material shall be completed before June 15, <br />1999. <br />1. The Contractor shall flake into account all contingent work which <br />is to be done by other parties, arising from any clause <br />whatsoever, and shall not plead his want of knowledge of said <br />contingent work as an excuse for a delay in his work, or for its <br />non-performance. <br />2. In the event that the construction of the project is not complete <br />by June 15, 1999, the County shall [lave the right to cancel its <br />obligations of any and ail financial responsibility for the project. <br />B. The County will perform a final inspection within fifteen (15) calendar <br />days of notice from Contractor of completion of work. <br />Vlll. BASIS OF PAYMENT <br />The work to be done includes the transportation of the County selected materials <br />from the donors' yard to the staging area, loading of the material onto the Contractor's <br />barge, transportation to the reef sites and placement of the material on the bottom in <br />accordance with the specification requirements. Payment shall be full compensation for <br />all services, labor, tools, equipment, and all other items necessary to complete the work <br />in accordance with these Specifications. <br />PLANS ANO TECHNICAL SPECIFICATIONS <br />:TS - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.