OPINION OF PROBABLE COST <br />Change Order Ni - West Wabasso Septic to Sewer <br />Phase 3A - 61st Drive <br />BOWMAN PROJECT No: OlOS14-01-013 <br />June 29, 2023 <br />SUBMITTED TO: Indian River County Department of Utility Services <br />Vero Beach, Florida 32960 <br />BY: BOWMAN CONSULTING GROUP, .LTD <br />4450 West Eau Gallie Blvd, Suite 144 <br />Melbourne, Florida 32964 <br />(321) 255.5434 Cert. of Authorization 30462 <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Item Cost <br />1 <br />Construct County Lift Station, Complete and Operable. Furnish <br />Pumps Package and Dataflow System, Pump package will <br />include pumps, cables, guide rails and assemblies, float <br />assembly, anchor bolts and washers and nuts, lifting bails, 55 <br />nipples and elbows, float switches, hatch covers, duplex <br />control panel, SS base plates and spare parts, concrete <br />driveway and housekeeping pad The price to include <br />Dataflow equipment with the spare Telemetry Control Unit <br />(TCU) Supply spare parts per IRCOUS Construction Standards <br />Section 10. <br />1 <br />LS <br />5355,650,00 <br />$355,650.00 <br />2 <br />Gravity Sewer - B" PVC 6'-8' Cut <br />712 <br />LF <br />$83.30 <br />$59,309.60 <br />3 <br />Gravity Sewer -8"PVC 8'-10'Cut <br />3S5 <br />LF <br />$92.58 <br />$32,865.90 <br />4 <br />Gravity Sewer - B" PVC 10'-12' Cut <br />67 <br />LF <br />$98.72 <br />$6,614.24 <br />5 <br />Sewer Lateral - 6" Single with Clean Out <br />19 <br />EA <br />$2,650.00 <br />$50,35000 <br />6 <br />Sewer Lateral - 6" Double with Clean Out <br />5 <br />EA <br />$3,650.00 <br />$18,25000 <br />7 <br />Standard Manholes 6'- 8' (4' Dia ) <br />2 <br />EA <br />$6,668.28 <br />$13,336.56 <br />B <br />Standard Manholes 6' • 10'(4' Dia,) <br />1 <br />EA <br />$11,10215 <br />$11,102.15 <br />9 <br />Standard Manholes 10' • 12' (5' Dia.) <br />2 <br />EA <br />$11,146.10 <br />$22,292.20 <br />30 <br />Sanitary Force Main 4" OR 18 PVC <br />1,260 <br />LF <br />$58,32 <br />$73,483.20 <br />11 <br />Wastewater MJ Pipe Fittings, Ductile Iron, All Sizes <br />0.25 <br />Ton <br />$14,759 77 <br />$3,689.94 <br />12 <br />Gate Valve, 4" dia. w/ Box and Conc, Pad <br />1 <br />EA <br />$2,001.08 <br />$2,001.08 <br />13 <br />12N 4" Tapping Sleeve & Gate Valve w/ Box & Conc Pad <br />i <br />EA <br />$9,06566 <br />$9,06566 <br />14 <br />Asphaltic Concrete, Superpave (Traffic C) Per FOOT Spec 334 <br />370 <br />Tons <br />$464.82 <br />$171,983.40 <br />15 <br />Optional Base Group 6 (8 -inches) -FOOT Spec 285 <br />2,800 <br />SY <br />$25.48 <br />$71,344.00 <br />16 <br />Type 8 Stabilized Subgrade (12 -inches)- Per FOOT Spec 160 <br />fLBR 40) <br />2,900 <br />SY <br />$23.50 <br />$68,150.00 <br />17 <br />5" Double Yellow Per FOOT Spec 711-8 <br />50 <br />LF <br />$4.08 <br />$204 00 <br />18 <br />24" White Per FOOT Spec 711-8 <br />12 <br />LF <br />$11.63 <br />$139.56 <br />19 <br />Raised Pavement Markers (RPM'S) - Class B, All Types & Colors <br />per FOOT Spec 706 <br />10 <br />EA <br />$5.00 <br />$5000 <br />20 <br />Sign - Object Marker, Type 4 (0M4.3) with Round Aluminum <br />Post per FOOT Spec. 705 <br />3 <br />EA <br />$250.00 <br />$750.00 <br />21 <br />Import Fill oer FDOTSoec 120 <br />1,300 <br />CY <br />S15.00 <br />$19,SDOD0 <br />22 <br />Restoration (Sod) <br />6,650 <br />SY <br />$31.21 <br />$207,546.50 <br />23 <br />TestlnR of Gravity Mains (TV & Exfiltration) <br />1,134 <br />LF <br />$15.34 <br />$17,395.56 <br />24 <br />Construction stake -Out Survey <br />1 <br />LS <br />$10,881.99 <br />$10,881.99 <br />25 <br />As -built Survey <br />1 <br />LS <br />$1,360.25 <br />$1,360.25 <br />26 <br />Erosion & Sediment Control <br />1 <br />LS <br />$62,409.21 <br />$62,409,21 <br />Sub Total Construction: <br />$1,289,725.00 <br />27 <br />Mobilization, Demobilization, MOT (See Section 01025) <br />1 <br />LS <br />$60,000.00 <br />$6Q000.00 <br />28 <br />Public Construction Bond: <br />1 <br />L5 <br />$18,451.77 <br />$18,451.77 <br />Estimated Project Total Cost:$1,368,176.77 <br />The opinion of cost, above, is based on West Wabasso Phase 3B contract prices provided by <br />Centerline Construction. It is true and accurate to the best of my knowledge; however, <br />actual construction cost may vary. Dlgitally signed by John M. <br />Boyer <br />Reason; Engineer's Seal / <br />Contact Info: � <br />jboyer@bowman cam <br />Date: 2023.06,29 <br />16:13:44-04'00' <br />s\ttr,,.,,,rrrr <br />�. No- 57970 :�12 <br />3 -0 Z_ <br />� pIV Z <br />0 STATE OF Ar <br />FLORtO�:• + <br />6. <br />'� <br />1"01NALtt� .. <br />