Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />2 June 2023 <br />Page 4 <br />Geosyntec" <br />consultants <br />scheduled for December 2023) will include sampling of 42 monitoring wells (31 using PDBs and 11 <br />wells via traditional purging techniques) to collect field water quality parameters. The Winter 2023 <br />field event is budgeted to include a total of 3 days (with 2 persons) for groundwater sampling activities <br />and PDB deployment for the Summer 2024 field event. Consistent field documentation and field <br />protocols will be utilized to develop reliable data to support the natural attenuation evaluation for the <br />groundwater plume. The groundwater samples will be analyzed in accordance with the sampling plan <br />summarized in the 2022 Annual Groundwater Monitoring Report. Quality control samples are <br />proposed to be collected at a rate of 5% of total samples as required by the most recent FDEP SOPs. <br />Geosyntec will conduct a complete round of groundwater level measurements concurrent with each <br />semi-annual groundwater sampling event (budgeted for 1 day with 2 -person field team for each event). <br />Depth to groundwater measurements will be recorded to the nearest 0.01 -ft in each monitoring well, <br />including existing monitoring wells and applicable City of Vero Beach wells (assumed up to 95 wells <br />per event). Overall, for field activities, budget has been included for 7 field days with 2 persons, <br />mobilization time for field personnel, and associated field expenses for sampling. <br />Due to wet site conditions and difficult access to certain well clusters, costs for rental of a utility phase <br />vehicle are included for 1 day of groundwater level measurements and 1 day of sampling per event (4 <br />total days). <br />It is anticipated that purge water (investigation -derived waste [IDW]) will be containerized in a 55 - <br />gallon polyethylene drum and temporarily staged on Site for characterization prior to removal and <br />disposal. Costs are included herein for purchase of one 55 -gallon polyethylene drum, drum removal <br />and disposal by a licensed subcontractor, and for 4 hours of drum removal oversight for 1 person. <br />Phase 5 — Data Evaluation and Semi -Annual Reporting: Under this phase, Geosyntec will perform <br />data evaluation activities and reporting. The reporting includes preparation of the Summer 2023 report <br />(simplified format entitled Summer 2023 Semi -Annual Groundwater Sampling Results) and the Winter <br />2023 report (2023 Annual Groundwater Monitoring Report) for submittal to FDEP. <br />The Summer 2023 report will be a letter report with attachments, including a monitoring well location <br />map and tables of the field and laboratory results. Data evaluation activities for the Summer 2023 report <br />will include database management, screening results against applicable regulatory criteria, and <br />summary data table preparation. This report is due to FDEP by 31 July 2023. <br />The Winter 2023 report will be consistent with the groundwater monitoring reports historically <br />submitted to FDEP for this Site and the data evaluation activities will include database management, <br />screening results against applicable regulatory criteria, GIS figure preparation, time trend analyses, <br />and/or statistical data analyses. The Winter 2023 annual report will be supported by attachments <br />containing Chain -of -Custody sheets, field notes and observations, water sampling logs, maps, graphs, <br />analytical results, quantitative statistical evaluation, and other applicable materials. As part of the <br />FR0766\XR23010.docx <br />engineers I scientists I innovators <br />