My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/20/2023
CBCC
>
Meetings
>
2020's
>
2023
>
06/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 10:17:51 AM
Creation date
8/11/2023 1:07:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/20/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />AGENDA ITEM <br />Assistant County Administrator/ <br />Department of General Services <br />'etoA% Parks and Recreation <br />To: The Honorable Board of County Commissioners <br />Through: John Titkanich, County Administrator <br />Michael C. Zito, Assistant County Administrator <br />Beth Powell, Director Parks and Recreation <br />From: Joseph Tilton, Recreation Manager <br />Subject: Work Order Number 2— Continuing Engineering Services REQ 2023015— <br />Intergenerational Recreation Center Dick Bird Park Improvements <br />BACKGROUND: <br />On January, 17, 2023, the Interim County Administrator, Michael Zito, under his authority, signed <br />Work Order Number 4, pursuant to the Continuing Services Contract Agreement dated April 17, <br />2018 (renewed and amended on May 18, 2021) RFQ 2018008 for the conceptual design of <br />improvements at the Dick Bird Regional Park in the amount of $3,300. Work included concept <br />planning and a pre -application meeting with the County to discuss proposed park improvements. <br />That Work Order was completed and a concept plan has been provided for formal design services. <br />Due to the expiration of the existing Continuing Services Contract (RFQ 2018008), a new Work <br />Order is proposed utilizing the RFQ 2023015, approved by the Board of County Commissioners on <br />May 2, 2023. This Work Order Number 2 will provide for the design and engineering services <br />necessary for the construction of a fitness station, pavilion, walking trail, and stormwater for <br />improvements outlined in the Capital Improvements associated with the Intergenerational <br />Recreation Center Dick Bird Park Improvements. Engineering services associated with this work <br />order include: Surveying Services, Engineering Design & Preparation of Construction Plans, Minor <br />Site Plan Approval, Permitting Assistance, Bidding Services and Specifications, and Construction <br />Administration Services for the Intergenerational Recreation Center Dick Bird Park Improvements. <br />Fees associated with this work order are outlined in the attached Scope of Work. <br />149 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.