My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/20/2023
CBCC
>
Meetings
>
2020's
>
2023
>
06/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 10:17:51 AM
Creation date
8/11/2023 1:07:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/20/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M J MASTELLER & MO <br />M1 — CIVIL ENGINEERS — <br />INC. <br />Task F — Construction Administration and Observation <br />165527 1h Street, Ste. 2, Vero Beach, FL 32960 <br />(772)567-5300 <br />Masteller & Moler, Inc. shall provide engineering services as needed during the construction of the project <br />generally including but not limited to the following: <br />1. Preparation for and attendance of a mandatory pre -construction meeting; <br />2. Periodic construction observations as needed; <br />3. Perform the walkthrough at the end of the construction; <br />4. Provide a punch list to the Contractor; <br />5. Review the As -built drawings; <br />6. Prepare Project Close-out/Certification documents. <br />Deliverables — The ENGINEER shall provide the COUNTY: <br />a. 60% Construction Plans and Preliminary Specifications — 1 Hard Copy + PDF <br />b. Final Construction Plans - 2 Sets + PDF <br />c. Bid Documents and Final Specifications necessary for Advertisement and Bidding of the work <br />d. Related digital AutoCAD, DOC, and PDF files <br />TIME SCHEDULE <br />Project shall be completed as follows: <br />Engineering Design & Preparation of Construction Plans (after NTP Receipt) 60 Working Days <br />Submittal of Permit Applications (after NTP Receipt) 80 Working Days <br />FEE SCHEDULE <br />The COUNTY agrees to pay, and the ENGINEER agrees to accept a maximum not -to -exceed amount of <br />$54,340.00 for the above-described services rendered based on the following: <br />Task A <br />— Surveying Services <br />$ <br />4,500.00 <br />Task B <br />— Engineering Design & Preparation of Construction Plans <br />$ <br />19,200.00 <br />Task C <br />— Minor Site Plan Approval* <br />$ <br />4,160.00 <br />Additional rounds of responses, hourly NTE (if necessary) <br />$ <br />2,710.00 <br />Task D <br />— Permitting* <br />$ <br />8,730.00 <br />Task E <br />— Bidding Services and Specifications <br />$ <br />7,110.00 <br />Task F — <br />Construction Administration Services <br />$ <br />7,930.00 <br />Project <br />Total <br />$ <br />54,340.00 <br />* Permit review fees are excluded from this Work Order. <br />File#2302 <br />(2302_iG Pa rkl m p_Echi b itA_23-0525.docx) <br />Page 3 of 3 <br />155 <br />
The URL can be used to link to this page
Your browser does not support the video tag.