i
<br />r
<br />Section D - Utility
<br />Dla
<br />Trackhoe (Medium)
<br />844.00
<br />HR
<br />$130.70
<br />$110,310.80
<br />To:
<br />Indian River County
<br />844.00
<br />Contact:
<br />Chris Hanson
<br />$100,714.52
<br />Address:
<br />1800 27th Street
<br />240.00
<br />Phone:
<br />$62.51
<br />$15,002.40
<br />Dlh
<br />Vero Beach, FL 32960
<br />844.00
<br />Fax:
<br />$28.41
<br />$23,978.04
<br />Project Name: 8th Street Utility Replacements/ Relocations
<br />Supervisor
<br />Bid Number:
<br />23-05012
<br />$107.97
<br />Project Location: Indian River County, Vero Beach, FL
<br />D2f
<br />Bid Date:
<br />5/19/2023
<br />HR
<br />$346.63
<br />$292,555.72
<br />D2a
<br />Crew Man (6th Man Of Pipe Crew)
<br />844.00
<br />HR
<br />Item #
<br />Item Description
<br />Estimated Quantity Unit
<br />Unit Price
<br />Total Price
<br />Section A
<br />$295.49
<br />$18,320.38
<br />D2d
<br />3 Man Crew Including 1 Foreman (Utility Test Crew)
<br />100.00
<br />Alb
<br />Mobilization - Non - Emergency
<br />1.00 EACH
<br />$1,704.75
<br />$1,704.75
<br />A2c
<br />Temporary Traffic Control - FDOT Roadway
<br />2,500.00 LF
<br />$1.31
<br />$3,275.00
<br />Total Price
<br />for above Section A Items:
<br />$4,979.75
<br />Section B
<br />$130.70
<br />$54,632.60
<br />Dlc
<br />Front End Loader
<br />418.00
<br />B3
<br />Coquina Rock Base (Material Only)
<br />430.00 CY
<br />$16.97
<br />$7,297.10
<br />B6a
<br />Sod Replacement - Bahia (Material Only)
<br />8,236.00 SY
<br />$1.23
<br />$10,130.28
<br />Crew Truck W/ Hand Tools
<br />418.00
<br />Total Price
<br />for above Section B Items:
<br />$17,427.38
<br />Section D - Utility
<br />Dla
<br />Trackhoe (Medium)
<br />844.00
<br />HR
<br />$130.70
<br />$110,310.80
<br />Dlc
<br />Front End Loader
<br />844.00
<br />HR
<br />$119.33
<br />$100,714.52
<br />Dlf
<br />Tandem Dump Truck
<br />240.00
<br />HR
<br />$62.51
<br />$15,002.40
<br />Dlh
<br />Crew Truck W/ Hand Tools
<br />844.00
<br />HR
<br />$28.41
<br />$23,978.04
<br />D2c
<br />Supervisor
<br />240.00
<br />HR
<br />$107.97
<br />$25,912.80
<br />D2f
<br />5 Man Crew Including 1 Foreman (Pipe Crew)
<br />844.00
<br />HR
<br />$346.63
<br />$292,555.72
<br />D2a
<br />Crew Man (6th Man Of Pipe Crew)
<br />844.00
<br />HR
<br />$51.14
<br />$43,162.16
<br />D2e
<br />4 Man Crew Including 1 Foreman (Utility Punch -out)
<br />62.00
<br />HR
<br />$295.49
<br />$18,320.38
<br />D2d
<br />3 Man Crew Including 1 Foreman (Utility Test Crew)
<br />100.00
<br />HR
<br />$244.35
<br />$24,435.00
<br />Total Price for above Section D - Utility Items:
<br />$654,391.82
<br />Section D - Roadwork
<br />Dla
<br />Trackhoe (Medium)
<br />418.00
<br />HR
<br />$130.70
<br />$54,632.60
<br />Dlc
<br />Front End Loader
<br />418.00
<br />HR
<br />$119.33
<br />$49,879.94
<br />Dld
<br />Grader
<br />418.00
<br />HR
<br />$111.38
<br />$46,556.84
<br />Dlh
<br />Crew Truck W/ Hand Tools
<br />418.00
<br />HR
<br />$28.41
<br />$11,875.38
<br />D2c
<br />Supervisor
<br />140.00
<br />HR
<br />$107.97
<br />$15,115.80
<br />D2e
<br />4 Man Crew Including 1 Foreman
<br />418.00
<br />HR
<br />$295.49
<br />$123,514.82
<br />Total Price for above Section D - Roadwork Items:
<br />$301,575.38
<br />Section E
<br />El
<br />Misc. Materials
<br />1.00
<br />LS
<br />$50,000.00
<br />$50,000.00
<br />E1
<br />Precast ARV Manholes - USCP
<br />1.00
<br />LS
<br />$7,024.34
<br />$7,024.34
<br />El
<br />Grout Material - Maschmeyer
<br />1.00
<br />LS
<br />$12,728.10
<br />$12,728.10
<br />El
<br />Import Hauling - Siboney
<br />1.00
<br />LS
<br />$2,802.53
<br />$2,802.53
<br />E2
<br />24" Line Stops / 8" X 8" Tap / 24" X 24" Taps -
<br />1.00
<br />LS
<br />$38,786.00
<br />$38,786.00
<br />Rangeline
<br />E2
<br />24" FPVC Force Main Directional Bore - K3 Directional
<br />1.00
<br />LS
<br />$108,130.00
<br />$108,130.00
<br />E2
<br />Grout Pumping Service - IR's Concrete Pumping, Inc.
<br />1.00
<br />LS
<br />$1,933.25
<br />$1,933.25
<br />(Based On Bid Tab Grout CY Quantities - 2 Days)
<br />E2
<br />24" Force Main Fusion Services For Directional Bore -
<br />1.00
<br />LS
<br />$5,830.00
<br />$5,830.00
<br />Aegion
<br />5/19/2023 11:54:30 AM Page 1 of 2
<br />257