Office Address:
<br />1'100 Technology Place, Suite 122
<br />West Palm Beach, Florida 33407
<br />Phoiw: (561) 932-1070 Pax: (561) 228-8918
<br />To: Indian River County
<br />Address: 1800 27th Street
<br />Vero Beach, FL 32960
<br />Trackhoe (Medium)
<br />Contact:
<br />Phone:
<br />Fax:
<br />Chris Hanson
<br />Project Name: 8th Street Utility Replacements/Relocations
<br />Project Location: Indian River County, Vero Beach, FL
<br />D1c
<br />Bid Number:
<br />Bid Date:
<br />23-05012
<br />5/19/2023
<br />$119.33
<br />$100,714.52
<br />Dlf
<br />Tandem Dump Truck
<br />Item # Item Description
<br />Estimated Quantity Unit
<br />Unit Price Total Price
<br />Section A
<br />Alb Mobilization - Non - Emergency
<br />A2c Temporary Traffic Control - FDOT Roadway
<br />Section B
<br />B3 Coquina Rock Base (Material Only)
<br />86a Sod Replacement - Bahia (Material Only)
<br />Section D - Utility
<br />1.00 EACH $1,704.75 $1,704.75
<br />2,500.00 LF $1.31 $3,275.00
<br />Total Price for above Section A Items: $4,979.75
<br />430.00 CY $16,97 $7,297.10
<br />8,236.00 SY $1.23 $10,130.28
<br />Total Price for above Section B Items: $17,427.38
<br />Dla
<br />Trackhoe (Medium)
<br />844.00 HR
<br />$130.70
<br />$110,310.80
<br />D1c
<br />Front End Loader
<br />844.00 HR
<br />$119.33
<br />$100,714.52
<br />Dlf
<br />Tandem Dump Truck
<br />240.00 HR
<br />$62.51
<br />$15,002.40
<br />D1h
<br />Crew Truck W/ Hand Tools
<br />844.00 HR
<br />$28.41
<br />$23,978.04
<br />D2c
<br />Supervisor
<br />240.00 HR
<br />$107.97
<br />$25,912.80
<br />D2f
<br />5 Man Crew Including 1 Foreman (Pipe Crew)
<br />844.00 HR
<br />$346.63
<br />$292,555.72
<br />D2a
<br />Crew Man (6th Man Of Pipe Crew)
<br />844.00 HR
<br />$51.14
<br />$43,162.16
<br />D2e
<br />4 Man Crew Including 1 Foreman (Utility Punch -out)
<br />62.00 HR
<br />$295.49
<br />$18,320.38
<br />D2d
<br />3 Man Crew Including 1 Foreman (Utility Test Crew)
<br />100.00 HR
<br />$244.35
<br />$24,435.00
<br />Total Price for above Section D - Utility Items:
<br />$654,391.82
<br />Section D -
<br />Roadwork
<br />Dla
<br />Trackhoe (Medium)
<br />418.00 HR
<br />$130.70
<br />$54,632.60
<br />D1c
<br />Front End Loader
<br />418.00 HR
<br />$119.33
<br />$49,879.94
<br />Did
<br />Grader
<br />418.00 HR
<br />$111.38
<br />$46,556.84
<br />D1h
<br />Crew Truck W/ Hand Tools
<br />418.00 HR
<br />$28.41
<br />$11,875.38
<br />D2c
<br />Supervisor
<br />140.00 HR
<br />$107.97
<br />$15,115.80
<br />D2e
<br />4 Man Crew Including 1 Foreman
<br />418.00 HR
<br />$295.49
<br />$123,514.82
<br />Total Price for above Section D - Roadwork Items:
<br />$301,575.38
<br />Section E
<br />El
<br />Misc. Materials
<br />1.00 LS
<br />$50,000.00
<br />$50,000.00
<br />El
<br />Precast ARV Manholes - USCP
<br />1.00 LS
<br />$7,024.34
<br />$7,024.34
<br />El
<br />Grout Material - Maschmeyer
<br />1.00 LS
<br />$12,728.10
<br />$12,728.10
<br />El
<br />Import Hauling - Siboney
<br />1.00 LS
<br />$2,802.53
<br />$2,802.53
<br />E2
<br />24" Line Stops / 8" X 8" Tap / 24" X 24" Taps -
<br />1.00 LS
<br />$38,786.00
<br />$38,786.00
<br />Rangeline
<br />E2
<br />24" FPVC Force Main Directional Bore - K3 Directional
<br />1.00 LS
<br />$108,130.00
<br />$108,130.00
<br />E2
<br />Grout Pumping Service - JR's Concrete Pumping, Inc.
<br />1.00 LS
<br />$1,933.25
<br />$1,933.25
<br />(Based On Bid Tab Grout CY Quantities - 2 Days)
<br />E2
<br />24" Force Main Fusion Services For Directional Bore -
<br />1.00 LS
<br />$5,830.00
<br />$5,830.00
<br />Aegion
<br />5/19/2023 11:54:30 AM
<br />Page 1 of 2
<br />259
<br />
|