Laserfiche WebLink
Office Address: <br />1'100 Technology Place, Suite 122 <br />West Palm Beach, Florida 33407 <br />Phoiw: (561) 932-1070 Pax: (561) 228-8918 <br />To: Indian River County <br />Address: 1800 27th Street <br />Vero Beach, FL 32960 <br />Trackhoe (Medium) <br />Contact: <br />Phone: <br />Fax: <br />Chris Hanson <br />Project Name: 8th Street Utility Replacements/Relocations <br />Project Location: Indian River County, Vero Beach, FL <br />D1c <br />Bid Number: <br />Bid Date: <br />23-05012 <br />5/19/2023 <br />$119.33 <br />$100,714.52 <br />Dlf <br />Tandem Dump Truck <br />Item # Item Description <br />Estimated Quantity Unit <br />Unit Price Total Price <br />Section A <br />Alb Mobilization - Non - Emergency <br />A2c Temporary Traffic Control - FDOT Roadway <br />Section B <br />B3 Coquina Rock Base (Material Only) <br />86a Sod Replacement - Bahia (Material Only) <br />Section D - Utility <br />1.00 EACH $1,704.75 $1,704.75 <br />2,500.00 LF $1.31 $3,275.00 <br />Total Price for above Section A Items: $4,979.75 <br />430.00 CY $16,97 $7,297.10 <br />8,236.00 SY $1.23 $10,130.28 <br />Total Price for above Section B Items: $17,427.38 <br />Dla <br />Trackhoe (Medium) <br />844.00 HR <br />$130.70 <br />$110,310.80 <br />D1c <br />Front End Loader <br />844.00 HR <br />$119.33 <br />$100,714.52 <br />Dlf <br />Tandem Dump Truck <br />240.00 HR <br />$62.51 <br />$15,002.40 <br />D1h <br />Crew Truck W/ Hand Tools <br />844.00 HR <br />$28.41 <br />$23,978.04 <br />D2c <br />Supervisor <br />240.00 HR <br />$107.97 <br />$25,912.80 <br />D2f <br />5 Man Crew Including 1 Foreman (Pipe Crew) <br />844.00 HR <br />$346.63 <br />$292,555.72 <br />D2a <br />Crew Man (6th Man Of Pipe Crew) <br />844.00 HR <br />$51.14 <br />$43,162.16 <br />D2e <br />4 Man Crew Including 1 Foreman (Utility Punch -out) <br />62.00 HR <br />$295.49 <br />$18,320.38 <br />D2d <br />3 Man Crew Including 1 Foreman (Utility Test Crew) <br />100.00 HR <br />$244.35 <br />$24,435.00 <br />Total Price for above Section D - Utility Items: <br />$654,391.82 <br />Section D - <br />Roadwork <br />Dla <br />Trackhoe (Medium) <br />418.00 HR <br />$130.70 <br />$54,632.60 <br />D1c <br />Front End Loader <br />418.00 HR <br />$119.33 <br />$49,879.94 <br />Did <br />Grader <br />418.00 HR <br />$111.38 <br />$46,556.84 <br />D1h <br />Crew Truck W/ Hand Tools <br />418.00 HR <br />$28.41 <br />$11,875.38 <br />D2c <br />Supervisor <br />140.00 HR <br />$107.97 <br />$15,115.80 <br />D2e <br />4 Man Crew Including 1 Foreman <br />418.00 HR <br />$295.49 <br />$123,514.82 <br />Total Price for above Section D - Roadwork Items: <br />$301,575.38 <br />Section E <br />El <br />Misc. Materials <br />1.00 LS <br />$50,000.00 <br />$50,000.00 <br />El <br />Precast ARV Manholes - USCP <br />1.00 LS <br />$7,024.34 <br />$7,024.34 <br />El <br />Grout Material - Maschmeyer <br />1.00 LS <br />$12,728.10 <br />$12,728.10 <br />El <br />Import Hauling - Siboney <br />1.00 LS <br />$2,802.53 <br />$2,802.53 <br />E2 <br />24" Line Stops / 8" X 8" Tap / 24" X 24" Taps - <br />1.00 LS <br />$38,786.00 <br />$38,786.00 <br />Rangeline <br />E2 <br />24" FPVC Force Main Directional Bore - K3 Directional <br />1.00 LS <br />$108,130.00 <br />$108,130.00 <br />E2 <br />Grout Pumping Service - JR's Concrete Pumping, Inc. <br />1.00 LS <br />$1,933.25 <br />$1,933.25 <br />(Based On Bid Tab Grout CY Quantities - 2 Days) <br />E2 <br />24" Force Main Fusion Services For Directional Bore - <br />1.00 LS <br />$5,830.00 <br />$5,830.00 <br />Aegion <br />5/19/2023 11:54:30 AM <br />Page 1 of 2 <br />259 <br />