My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/20/2023
CBCC
>
Meetings
>
2020's
>
2023
>
06/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 10:17:51 AM
Creation date
8/11/2023 1:07:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/20/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A AEGIO N* ;,G unde,gl-o.rnd Solutions Order Summary <br />Stronger. Safer. Infrastructure.' ; <br />Date Prepared: 4/4/2023 Prepared For. Bidding Contractors Project Reference: 8th Street Utility Replacement <br />Proposal No.: P23-0439 Prepared By: Robert Tatum Project Site: Vero Beach, FL <br />PRODUCTS AND SERVICES: <br />D scription Unit Est- Cty.* Unit Cost Total Cost $ <br />1 Fusion Services for 18"-30" Pipe (T-900 Machine & tabor) Per Day 2 $2,650 TBD <br />2 Mobilization/Demobilization Event to the Site Per Event 1 Included Included <br />'Total number of billed fusion days will be based on actual time on-site. This is for fusing 520' of 24" DRIB pipe. <br />SCOPE OF WORK:fv— <br />x '� <br />Equipment/Services Provided by Underground Solutions, Inc., d/b/a UGS, Inc. in California ("UGS" or "Seller"): pt CX � !t/ ✓ j <br />J <br />1 Fusion machine with inserts. <br />2 Fusion Services are estimated at 2 consecutive 10 -hour work days. The actual duration of fusion services may vary based on site conditions and contractor , <br />support, and will be charged at the daily rate listed above for actual days on-site. <br />3 Mobilization/demobilization event to the site. <br />4 " Pull -head rental rates and terms are defiled below. <br />5 Per diem expenses have been included in the Daily Rate. <br />6 Minimum charge will be one 10 -hour day. Any work performed in excess of ten (10) hours per day will be charged an additional $108.00 per hour. <br />7 Any work performed on holidays or Sundays will be charged an additional $144.00 per hour. <br />Equipment/Services Provided by Buyer: <br />1 All labor, equipment, and material required to unload and stage pipe and fusion equipment at site (and restage as necessary). <br />2 All labor, equipment, and materials for loading and unloading pipe onto the fusion machine, positioning fused pipe, pipe reconnections, pipe ballasting, pipe <br />handling, required testing, and pipe installation. <br />3 Any additional labor, equipment, and materials required to fuse based on actual weather conditions (contact UGS for guidance). <br />4 Pipe rollers required for installation and any intermediate fusion (contact UGS for guidance). <br />5 All excavation, traffic control, permits, bonds, repairs, etc. <br />nil..�tlt�l...,a♦4..:..1.-;a-i..-i..A..C....1/....41... lt.,,,,.1 <br />...............AR...If...itl_G'.......r..�.r..�/_.f <br />7 All temporary bypass piping. y v <br />8 Installation hardware and equipment for fittings, valves or additional accessories not identified in UGS Scope of Work. <br />PULL -HEAD TERMS: A pull -head is available for rental or purchase from UGS via the following link: http://www.ugsproducts com. Actual freight costs will be <br />added to the final pull -head rental charge following return of the pull -head to UGS. For pull -head purchases, a freight cost to the shipping <br />destination will be added to the final purchase amount <br />Typical lead time for l- is 7-10. t t of order. Pul4keads.sWvout of Warrendale, PA. <br />24" Pull -head Included ful8 $522 632 <br />PAYMENT TERMS: 100% of each purchase price component shown above, net 30 days after completion of such component <br />PROPOSAL VALIDITY: Price quoted is valid for 30 business days from the date of this Proposal. <br />FUSION SCHEDULE: To be negotiated. UGS will take reasonable action to meet Buyers's installation schedule. Buyer must provide 30 business days notice to UGS <br />prior to the start date for fusion services (see Section 3 of Supplemental Terms and Conditions Fusion Services). <br />REMOBILIZATION TERMS: Additional mobilization events will be charged at the following rates. <br />="�Fc= <br />TAXES: The Purchase Price does not include any sales or similar taxes, which are the Buyers responsibility (see Section 5 of ServicesTerms 6 Conditions). <br />This Proposal is subject to the Terms and Conditions at http;//aegion.com/-/media/Aegion2017/Files/Terms/Underground%20Solutions%2OFusion%2OServicc%2OTerms.pdf, which <br />form an integral part of this Proposal. Such Terms and Conditions will govern any transaction resulting from this Proposal. Any contract resulting from this Proposal is made subject to <br />prior acceptance by UGS at Its offices in Poway, California. All orders are subject to prior credit approval— <br />Buyer's signature indicates acceptance of the UGS Order Summary and Terms and Conditions_ <br />Buyer's Authorized Signature <br />Date <br />Print Name & Title Print Company Name <br />11 Tax Exempt (must provide Tax Exempt Certificate with order) Taxable 0 State Registered Wholesaler <br />272 <br />
The URL can be used to link to this page
Your browser does not support the video tag.