My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/20/2023
CBCC
>
Meetings
>
2020's
>
2023
>
06/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 10:17:51 AM
Creation date
8/11/2023 1:07:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/20/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRST AMENDMENT TO WEST WABASSO SEPTIC <br />TO SEWER PHASE 3B AGREEMENT <br />THIS FIRST AMENDMENT TO WEST WABASSO SEPTIC TO SEWER PHASE <br />3B AGREEMENT ("First Amendment") is entered into as of the _ day of June, 2023 by and <br />between Indian River County, a political subdivision of the State of Florida, hereinafter referred <br />to as the "OWNER", and Centerline, Inc., hereinafter referred to as "CONTRACTOR". <br />RECITALS <br />WHEREAS, on September 13, 2022, OWNER and CONTRACTOR entered into the <br />West Wabasso Septic to Sewer Phase 3B Agreement "Agreement" for constructing a new gravity <br />sanitary sewer system to serve the West Wabasso areas generally along 58th Court and 59th Avenue <br />south of CR 510; and <br />WHEREAS, OWNER and CONTRACTOR, due to time restraints under existing grants, <br />desire to amend the Agreement to include construction of a new gravity sanitary sewer system to <br />serve the West Wabasso areas generally along 61" Drive, north of CR 510 under the same price <br />schedule, excluding mobilization, demobilization and MOT, and the same timeline as set forth in <br />the Agreement. <br />NOW THEREFORE, in consideration of the mutual undertakings herein and other good <br />and valuable consideration, the receipt and adequacy of which is hereby acknowledged, the parties <br />agree, as follows: <br />1. Recitals. The above recitals are true and correct and are incorporated herein. <br />2. Article 1 WORK amended. Article 1 WORK of the Agreement is hereby amended to add <br />the following: Construction of a new gravity sanitary sewer system to serve the West <br />Wabasso areas generally along 61St Drive, north of CR 510. The project will include <br />approximately 150 LF of roadway extension, 1,134 LF of gravity sewer main, 1,260 LF of <br />sanitary force main, five manholes; a lift station and related valves, fittings, laterals, <br />services, and restoration of trenches and roadway. Owner has assigned West Wabasso <br />Phase 3A — Project ID (PID) 21.21.512A. <br />3. CONTRACT TIMES. The Work described in Section 2 above, will be performed under <br />the same Contract Times terms as set forth in the Agreement, except that times for <br />Substantial Completion shall be 61 days to 270 days and times for Final Completion shall <br />be 271 days to 300 days with the times determined by the issuance of the Notice to Proceed <br />for the work set forth in this First Amendment. <br />4. CONTRACT PRICE. The Contract Price for the work described in Section above will <br />be in the amount of $1,012,526.77. <br />Page I of 3 <br />277 <br />
The URL can be used to link to this page
Your browser does not support the video tag.