Hurricanes Ian and Nicole Recovery Plan, December 9, 2022 <br />Recommend dune nourishment to restore volumes lost due to storms. Project is FEMA <br />Category B eligible. FEMA eligible non-federal cost share based on FEMA 75% and 25% <br />state/local share is $7,977,075.00. <br />South Ponte Vedra Beach Restoration Project, R-76 to R-103.5 <br />The South Ponte Vedra Beach Restoration project was initially constructed by St. Johns <br />County in 2021/22. Based on pre and post beach surveys, it is estimated there was approximately <br />171,199 cubic yards of sand lost to the combination of Hurricanes Ian and Nicole. <br />Recommend nourishment to restore volumes lost due to storms. Estimated construction <br />cost is $6,163,164.00. Project is FEMA Category G eligible. <br />FEMA eligible non-federal cost share based on FEMA 75% and 25% state/local share is <br />$1,540,791.00. <br />South Ponte Vedra and Vilano Beach Coastal Storm Risk Management Project, R-102.5 to <br />R-117.5 <br />The South Ponte Vedra and Vilano Beach Coastal Storm Risk Management Project is a <br />federally authorized project managed by the USACE. As the project is federally authorized it is <br />eligible for FCCE recovery funds. However, the project was already anticipated for construction <br />in 2023 under FCCE funds. Recommend proceeding with nourishment. No non-federal dollars <br />needed outside of normal management programs. <br />St. Johns County Shore Protection Project, R-136.3 to R-150,6 <br />Project is a federally authorized project managed by the USACE. As the project is <br />federally authorized it is eligible for FCCE recovery funds. However, the project was already <br />anticipated for construction in 2023 under FCCE funds. Recommend proceeding with <br />nourishment. No non-federal dollars needed outside of normal management programs. <br />Summer Haven Dune and Beach Nourishment, R-200 to R-209 <br />This area is authorized for sand placement under several permits or projects. This stretch <br />of shoreline should be eligible for FEMA funds. However, due to numerous breaches of the <br />beach and dune system during storm events, most recently during Hurricane Nicole, activities are <br />ongoing at this location. Furthermore, there are several studies either in process now, or will be <br />conducted soon, that will evaluate options for better managemen� of this beach. No non-federal <br />dollars needed outside of normal management programs or existing appropriations at this <br />time. <br />Flagler County <br />North Flagler County Dunes, R-2.3 to R-11.8, R-15.9 to 24.3, and R47.9 to R-65 <br />The North Flagler County Dune Project is managed by Flagler County. Based on pre and <br />post storm surveys, it is estimated there was approximately 564,570 cubic yards of sand lost to <br />the combination of Hurricanes Ian and Nicole. <br />Recommend dune nourishment to restore volumes lost due to storms. Estimated <br />construction cost is $39,519,900.00. Project is FEMA Category G eligible. <br />FEMA eligible non-federal cost share based on FEMA 75% and 25% state/local share is <br />$9,879,975.00. <br />Flagler County- Remaining Unconstructed Beaches <br />Page 13 of 21 343 <br />