My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/20/2023
CBCC
>
Meetings
>
2020's
>
2023
>
06/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 10:17:51 AM
Creation date
8/11/2023 1:07:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/20/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
57 <br />(c) 10'-12' <br />1 <br />EA. <br />$ <br />500.00 <br />$ 568.25 <br />$ 598.82 <br />$ 400.00 <br />$ 454.60 <br />$ 479.69 <br />$ 900.00 <br />$1,022.85 <br />$1,079.31 <br />A51 <br />Relocate Fire Hydrant <br />1 <br />EA. <br />$ <br />1,700.00 <br />$ 1,932.05 <br />$ 2,035.99 <br />$ 1,200.00 <br />$ 1,363.80 <br />$ 1,439.08 <br />$ 2,900.00 <br />$3,295.85 <br />$3,477.78 <br />A52 <br />2" Jumper Connection <br />1 <br />EA. <br />$ <br />1,600.00 <br />$ 1,818.40 <br />$ 1,916.23 <br />$ 750.00 <br />$ 852.38 <br />$ 899.43 <br />$ 2,350.00 <br />$2,670.78 <br />$2,818.20 <br />A53 <br />Asbestos Pipe Abatment <br />$ - <br />$0.00 <br />(a) 6" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 14.00 <br />$ 15.91 <br />$ 16.79 <br />$ 14.00 <br />$15.91 <br />$16.79 <br />(b) 8" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 18.00 <br />$ 20.46 <br />$ 21.59 <br />$ 18.00 <br />$20.46 <br />$21.59 <br />(c) 10" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 20.00 <br />$ 22.73 <br />$ 23.98 <br />$ 20.00 <br />$22.73 <br />$23.98 <br />(d) 12" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 22.00 <br />$ 25.00 <br />$ 26.38 <br />$ 22.00 <br />$25.00 <br />$26.38 <br />(e) 16" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 28.00 <br />$ 31.82 <br />$ 33.58 <br />$ 28.00 <br />$31.82 <br />$33.58 <br />A54 <br />Root Barrier <br />1 <br />L.F. <br />$ <br />$ 25.00 <br />$ 28.41 <br />$ 29.98 <br />$ 25.00 <br />$28.41 <br />$29.98 <br />A55 <br />Utility Pole Support <br />1 <br />EA <br />$ - <br />$ 2,500.00 <br />$ 2,841.25 <br />$ 2,998.09 <br />$ 2,500.00 <br />$2,841.25 <br />$2,998.09 <br />A56 <br />1 Remove and Reinstall Trees <br />1 <br />EA <br />$ - <br />$ 1,200.00 <br />$ 1,363.80 <br />$ 1,439.08 <br />$ 1,200.00 <br />$1,363.80 <br />$1,439.08 <br />A57 <br />Schedule 40 PVC Casing Pipe <br />$ - <br />$0.00 <br />(a) 4" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 10.00 <br />$ 11.37 <br />$ 11.99 <br />$ 10.00 <br />$11.37 <br />$11.99 <br />(b) 6" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 12.00 <br />$ 13.64 <br />$ 14.39 <br />$ 12.00 <br />$13.64 <br />$14.39 <br />(c) 8" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 16.00 <br />$ 18.18 <br />$ 19.19 <br />$ 16.00 <br />$18.18 <br />$19.19 <br />(d) 10" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 20.00 <br />$ 22.73 <br />$ 23.98 <br />$ 20.00 <br />$22.73 <br />$23.98 <br />(e) 12" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 25.00 <br />$ 28.41 <br />$ 29.98 <br />$ 25.00 <br />$28.41 <br />$29.98 <br />(f) 14" <br />1 <br />L.F. <br />NA <br />$ <br />$ 34.00 <br />$ 38.64 <br />$ 40.77 <br />$ 34.00 <br />$38.64 <br />$40.77 <br />(g) 16" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 45.00 <br />$ 51.14 <br />$ 53.97 <br />$ 45.00 <br />$51.14 <br />$53.97 <br />(h) 18" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 90.00 <br />$ 102.29 <br />$ 107.93 <br />$ 90.00 <br />$102.29 <br />$107.93 <br />1 <br />L.F. <br />NA <br />$ - <br />$ 200.00 <br />$ 227.30 <br />$ 239.85 <br />$ 200.00 <br />$227.30 <br />$239.85 <br />1 <br />L.F. <br />NA <br />$ - <br />$ 250.00 <br />$ 284.13 <br />$ 299.81 <br />$ 250.00 <br />$284.13 <br />$299.81 <br />(k) 24" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 300.00 <br />$ 340.95 <br />$ 359.77 <br />$ 300.00 <br />$340.95 <br />$359.77 <br />A58 <br />Steel casing <br />$ <br />$0.00 <br />(a) 4" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 20.00 <br />$ 22.73 <br />$ 23.98 <br />$ 20.00 <br />$22.73 <br />$23.98 <br />(b) 6" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 25.00 <br />$ 28.41 <br />$ 29.98 <br />$ 25.00 <br />$28.41$29.98 <br />(c) 8" <br />1 <br />L.F. <br />NA <br />I <br />$ - <br />$ 40.00 <br />$ 45.46 <br />$ 47.97 <br />$ 40.00 <br />$45.46 <br />$47.97 <br />(d) 10" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 45.00 <br />$ 51.14 <br />$ 53.97 <br />$ 45.00 <br />$51.14 <br />I $53.97 <br />(e) 12" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 50.00 <br />$ 56.83 <br />$ 59.96 <br />$ 50.00 <br />$56.83 <br />$59.96 <br />(f) 14" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 70.00 <br />$ 79.56 <br />$ 83.95 <br />$ 70.00 <br />$79.56 <br />$83.95 <br />(g) 16" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 80.00 <br />$ 90.92 <br />$ 95.94 <br />$ 80.00 <br />$90.921 <br />$95.94 <br />(h) 18" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 90.00 <br />$ 102.29 <br />$ 107.93 <br />$ 90.00 <br />$102.29 <br />$107.93 <br />(i) 20" <br />1 <br />L.F. <br />NA <br />$ <br />$ 120.00 <br />$ 136.38 <br />$ 143.91 <br />$ 120.00 <br />$136.38 <br />$143.91 <br />0) 22" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 200.00 <br />$ 227.30 <br />$ 239.85 <br />$ 200.00 <br />$227.30 <br />$239.85 <br />(k) 24" <br />1 <br />L.F. <br />NA <br />$ - <br />$ 300.00 <br />$ 340.95 <br />$ 359.77 <br />$ 300.00 <br />$340.95 <br />$359.77 <br />$ - <br />$ - <br />1 $0.00 <br />B - Restoration <br />$ - <br />$0.00 <br />B1 <br />Pavement Repair and Replacement <br />$ - <br />$0.00 <br />(a) Asphalt Road <br />1 <br />S.V. <br />$ - <br />$ 65.00 <br />$ 73.87 <br />$ 77.95 <br />$ 65.00 <br />$73.87 <br />$77.95 <br />(b) Asphalt Driveway <br />1 <br />S.Y. <br />$ - <br />$ 50.00 <br />$ 56.83 <br />$ 59.96 <br />$ 50.00 <br />$56.83 <br />1$59.96 <br />(c) Asphalt Millings <br />1 <br />S.V. <br />$ - <br />$ 35.00 <br />$ 39.78 <br />$ 41.97 <br />$ 35.00 <br />$39.78$41.97 <br />(d) Asphalt overlay <br />1 <br />S.V. <br />$ - <br />$ 30.00 <br />$ 34.10 <br />$ 35.98 <br />$ 30.00 <br />$34.10 <br />$35.98 <br />(e) Add. 5-3 Asphalt <br />1 <br />Ton <br />$ - <br />$ 350.00 <br />$ 397.78 <br />$ 419.73 <br />$ 350.00 <br />$397.78 <br />$419.73 <br />(0 Cold Mix Asphalt <br />1 <br />Ton <br />$ - <br />$ 200.00 <br />$ 227.30 <br />$ 239.85 <br />$ 200.00 <br />$227.301 <br />$239.85 <br />(g) Concrete Driveway (6") <br />1 <br />S.Y. <br />$ - <br />$ 65.00 <br />$ 73.87 <br />$ 77.95 <br />$ 65.00 <br />$73.87 <br />$77.95 <br />(h) Concrete Sidewalk (4") <br />1 <br />S.Y. <br />$ - <br />$ 50.00 <br />$ 56.83 <br />$ 59.96 <br />$ 50.00 <br />$56.83 <br />$59.96 <br />(i) Concrete Curb <br />$ - <br />$0.00 <br />1. Curb and Gutter <br />1 <br />L.F. <br />$ - <br />$ 50.00 <br />$ 56.83 <br />$ 59.96 <br />$ 50.00 <br />$56.83 <br />$59.96 <br />2.'D' Curb <br />1 <br />L.F. <br />$ - <br />$ 50.00 <br />$ 56.83 <br />$ 59.96 <br />$ 50.00 <br />$56.83 <br />$59.96 <br />(j) Concrete Driveway Paver Block <br />1 <br />S.Y. <br />$ - <br />$ 45.00 <br />$ 51.14 <br />$ 53.97 <br />$ 45.00 <br />$51.14 <br />$53.97 <br />(k) Lime rock Driveway <br />1S <br />.Y. <br />$ - <br />$ 35.00 <br />$ 39.78 <br />$ 41.97 <br />$ 35.00 <br />$39.78 <br />$41.97 <br />(I) Asphalt sidewalk <br />1 <br />S.Y. <br />$ - <br />$ 60.00 <br />$ 68.19 <br />$ 71.95 <br />$ 60.00 <br />$68.19 <br />$71.95 <br />B2 <br />Milling Asphalt <br />1 <br />S.Y. <br />$ - <br />$ 25.00 <br />$ 28.41 <br />$ 29.98 <br />$ 25.00 <br />$28.41 <br />$29.98 <br />83 <br />Coquina Rock Base <br />1 <br />C.Y. <br />$ - <br />$ 30.00 <br />$ 34.10 <br />$ 35.98 <br />$ 30.00 <br />$34.10 <br />$35.98 <br />B4 <br />Flowable Fill <br />$ - <br />$0.00 <br />(a) 0 - 4 cy (include short load fees) <br />1 <br />C.Y. <br />$ - <br />$ 350.00 <br />$ 397.78 <br />$ 419.73 <br />$ 350.00 <br />$397.78 <br />$419.73 <br />(b) 4 - 8 cy (include short load fees) <br />1 <br />C.Y. <br />$ - <br />$ 275.00 <br />$ 312.54 <br />$ 329.79 <br />$ 275.00 <br />$312.54 <br />$329.79 <br />(c) > 8cy <br />1 <br />C.Y. <br />$ <br />$ 200.00 <br />$ 227.30 <br />$ 239.85 <br />$ 200.00 <br />$227.30 <br />$239.85 <br />B5 <br />Miscellaneous Materials <br />$ - <br />$0.00 <br />(a) Sand <br />1 <br />C.Y. <br />$ - <br />$ 45.00 <br />$ 51.14 <br />$ 53.97 <br />$ 45.00 <br />$51.14 <br />$53.97 <br />(b) Fill <br />1 <br />C.Y. <br />$ - <br />$ 45.00 <br />$ 51.14 <br />$ 53.97 <br />$ 45.00 <br />$51.14 <br />$53.97 <br />(c) #57 Rock <br />1 <br />C.Y. <br />$ - <br />$ 45.00 <br />$ 51.14 <br />$ 53.97 <br />$ 45.00 <br />$51.14 <br />$53.97 <br />(d) Shell Rock <br />1 <br />C.Y. <br />$ - <br />$ 55.00 <br />$ 62.51 <br />$ 65.96 <br />$ 55.00 <br />$62.51 <br />$65.96 <br />(e) Suremix Concrete 80# <br />1 <br />Bag <br />$ - <br />$ 25.00 <br />$ 28.41 <br />$ 29.98 <br />$ 25.00 <br />$28.41 <br />$29.98 <br />B6 <br />Sod Replacement <br />$ - <br />$0.00 <br />(a) <br />Bahia <br />1 <br />S.Y. <br />$ - <br />$ 4.00 <br />$ 4.55 <br />$ 4.80 <br />$ 4.00 <br />$4.55 <br />$4.80 <br />(b) <br />Floratam <br />1 <br />S.Y. <br />$ - <br />$ 6.00 <br />$ 6.82 <br />$ 7.20 <br />$ 6.00 <br />$6.82 <br />$7.20 <br />Seed and Mulch <br />1 <br />S.Y. <br />$ - <br />$ 5.00 <br />$ 5.68 <br />$ 6.00 <br />$ 5.00 <br />$5.68 <br />$6.00 <br />Mailbox Removal and Reinstallation <br />1 <br />EA <br />$ - <br />$ 800.00 <br />$ 909.20 <br />$ 959.39 <br />$ 800.00 <br />$909.20 <br />$959.39 <br />FSECTION <br />Sprinkler System Repair per Yard <br />1 <br />EA <br />$ - <br />$ 1,200.00 <br />$ 1,363.80 <br />$ 1,439.08 <br />$ 1,200.00 <br />$1,363.80 <br />$1,439.08 <br />Handicap Ramp Restoration <br />1 <br />EA <br />$ - <br />$ 500.00 <br />$ 568.25 <br />$ 599.62 <br />$ 500.00 <br />$568.25 <br />$599.62 <br />$ - <br />$0.00 <br />C - High DensityPolyethylene Piping & Horizontal <br />Directional Boring <br />$ - <br />$0.00 <br />High Density Polyethylene Pipe (HDPE) -Trench <br />$ - <br />$0.00 <br />(a) 2 -inch <br />1 <br />L.F. <br />$ <br />3.00 <br />$ 3.41 <br />$ 3.59 <br />$ 12.00 <br />$ 13.64 <br />$ 14.39 <br />$ 15.00 <br />$17.05 <br />$17.99 <br />(b) 4 -inch <br />1 <br />L.F. <br />$ <br />6.00 <br />$ 6.82 <br />$ 7.19 <br />$ 14.00 <br />$ 15.91 <br />$ 16.79 <br />$ 20.00 <br />$22.731 <br />$23.98 <br />(c) 6 -inch <br />1 <br />L.F. <br />$ <br />10.00 <br />$ 11.37 <br />$ 11.98 <br />$ 16.00 <br />$ 18.18 <br />$ 19.19 <br />$ 26.00 <br />$29.55 <br />$31.18 <br />(d) 8 -inch <br />1 <br />L.F. <br />$ <br />18.00 <br />$ 20.46 <br />$ 21.56 <br />$ 18.00 <br />$ 20.46 <br />$ 21.59 <br />$ 36.00 <br />$40.91 <br />$43.17 <br />(e) 12 inch <br />1 <br />L.F. <br />$ <br />32.00 <br />$ 36.37 <br />$ 38.32 <br />$ 20.00 <br />$ 22.73 <br />$ 23.98 <br />$ 52.00 <br />$59.10 <br />$62.36 <br />(f) 16 -inch <br />1 <br />L.F. <br />$ <br />60.00 <br />$ 68.19 <br />$ 71.86 <br />$ 24.00 <br />$ 27.28 <br />$ 28.78 <br />$ 84.00 <br />$95.47 <br />$100.74 <br />(g) 18 -inch <br />1 <br />I L.F. <br />$ <br />70.00 <br />$ 79.56 <br />$ 83.84 <br />$ 30.00 <br />$ 34.10 <br />$ 35.98 <br />$ 100.00 <br />$113.65 <br />$119.92 <br />57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.