My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/06/2023
CBCC
>
Meetings
>
2020's
>
2023
>
06/06/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 11:08:34 AM
Creation date
8/14/2023 10:56:53 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/06/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION <br />STATE HIGHWAY SYSTEM <br />PROJECT FUNDING AGREEMENT <br />EXHIBIT E <br />TERMS AND CONDITIONS OF CONSTRUCTION <br />1. Design and Construction Standards and Required Approvals. <br />a. The Agency understands that it is responsible for the preparation and certification of all design <br />plans for the Project. The Agency shall hire a qualified consultant for the design phase of the <br />Project or, if applicable, the Agency shall require their design -build contractor or construction <br />management contractor to hire a qualified consultant for the design phase of the Project. <br />b. Execution of this Agreement by both Parties shall be deemed a Notice to Proceed to the Agency <br />for the design phase or other non -construction phases of the Project. If the Project involves a <br />construction phase, the Agency shall not begin the construction phase of the Project until the <br />Department issues a Notice to Proceed for the construction phase. Prior to commencing the <br />construction work described in this Agreement, the Agency shall request a Notice to Proceed from <br />the Department's Project Manager, Daniel A. Smith (email: Daniel. smith@,dot.state.fl.us) or from <br />an appointed designee. Any construction phase work performed prior to the execution of this <br />required Notice to Proceed is not subject to reimbursement. <br />c. The Agency will provide one (1) copy of the final design plans and specifications and final bid <br />documents to the Department's Project Manager prior to bidding or commencing construction of <br />the Project. <br />d. The Agency shall require the Agency's contractor to post a payment and performance bond in <br />accordance with applicable law(s). <br />e. The Agency shall be responsible to ensure that the construction work under this Agreement is <br />performed in accordance with the approved construction documents, and that the construction <br />work will meet all applicable Agency and Department standards. <br />E Upon completion of the work authorized by this Agreement, the Agency shall notify the <br />Department in writing of the completion of construction of the Project; and for all design work <br />that originally required certification by a Professional Engineer, this notification shall contain an <br />Engineer's Certification of Compliance, signed and sealed by a Professional Engineer, the form of <br />which is attached to this Exhibit. The certification shall state that work has been completed in <br />compliance with the Project construction plans and specifications. If any deviations are found from <br />the approved plans or specifications, the certification shall include a list of all deviations along <br />with an explanation that justifies the reason to accept each deviation. <br />2. Construction on the Department's Right of Way. If the Project involves construction on the <br />Department's right-of-way, then the following provisions apply to any and all portions of the Project that <br />are constructed on the Department's right-of-way: <br />a. The Agency shall hire a qualified contractor using the Agency's normal bid procedures to perform <br />the construction work for the Project. The Agency must certify that the installation of the Project <br />is completed by a Contractor prequalified by the Department as required by Section 2 of the <br />Page 22 of 29 <br />107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.