Laserfiche WebLink
Addendum 1- Bid Form <br />14.2" HDPE DR -11 Force Main (Directional <br />Bore) <br />$40.00 <br />LF <br />$9,600.00 <br />15, 2" HDPE DR -11 Force Main (Open Cut) <br />23 <br />$575.00 <br />16.4" PVC Gravity Sewer <br />$25.00 <br />LF� <br />$175.00 <br />17.6"x4" Service Saddle & Tap <br />$6,000.00 <br />EA <br />1 <br />$fi,000.00 <br />18.4" Gate Valve <br />$2,850.00 <br />EA <br />1 <br />$ 2,850.00 <br />19.4"x2" Reducer <br />$800.00 <br />1 <br />$800.00 <br />20. Private Duplex Lift Station <br />$40,000.00 <br />jEA <br />I <br />$40,00 0.00 <br />21. Electrical for Lift Station <br />$ 2,200.00 <br />LS <br />1 <br />$ 2,200.00 <br />22.2" Gate Valve <br />$1,200.00 <br />EA <br />1 <br />$1,200.00 <br />23.2" Curb Stop <br />$1,200.00 <br />EA <br />1 <br />$1,200.00 <br />24. Meter Box <br />$400.00EA <br />1 <br />$400.00 <br />25. Survey StakeOut <br />$1,500.00l.5 <br />1 <br />$1,500.00 <br />26. Testing <br />$1,000.00 <br />LS <br />1 <br />$1,000.00 <br />27. As-Builts <br />$5,000.00 <br />LS <br />1 <br />$ 5,000.00 <br />28. Public Construction Bond (if total bid <br />exceeds $100,000) <br />$2,000.00 <br />LS <br />1 <br />$2,000.00 <br />Total Bid Price <br />$, / O tf_ / 7b <br />Total Bid Price In Words <br />Project completion time after receipt of "Notice to Proceed" or PO: DAYS <br />