Laserfiche WebLink
of <br />40 <br />Attachment $i' - Cost Estimate <br />Cost Summary <br />on tructlon _ <br />Phase ! Oslo Road/19th Ave/10th Street <br />Phase it 19th Ave/10th Street <br />Phase II 20th Ave <br />Total <br />$ <br />$ <br />$ <br />$ <br />64,789.80 <br />51,484.80 <br />_ 25,205.05 <br />141,479.65 <br />Professional <br />Engineering Desi n/Permittin <br />-Engineering Ins ections/Certitications <br />SurveyDesign <br />Surve Stake-out/As-BuiRs <br />Soil Borings/Testing esting <br />Total <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />Phase I <br />500.00 <br />750.00 <br />_ 150.00 <br />1,000.00 <br />250.00 <br />2,650.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />Phase II <br />4,500.00 <br />750.00 <br />600.00 <br />1,500.00 <br />750.00 <br />8,100.00 <br />Total Cost Phase 1 <br />$ <br />67,439.80 <br />Total Cost Phase II <br />$ <br />84,789.86 <br />1 of 3 <br />