My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-182
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2023 2:15:39 PM
Creation date
8/21/2023 2:15:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/13/1999
Control Number
1999-182
Entity Name
Carter & Associates
Subject
Work Order #3 for Professional Civil Services Master Agreement, August 4, 1998
Vero Lake Estates Stormwater Improvements, Phase I
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.• // r, l <br />Indian River County 9 1 'Lia - <br />Task 01— Vero Lake Estates Stormwater Improvements, Phase I <br />WORK ORDER NO.3 TO THE PROFESSIONAL, <br />CIVIL SERVICES MASTER AGREEMENT <br />BETWEEN CARTER ASSOCIATES, INC., <br />DATED AUGUST 4,1998 AND <br />® INDIAN RIVER COUNTY, FLORIDA <br />Pursuant to the Professional Services Agreement dated August 4, 1998, by and between Indian River <br />• County, a political subdivision of the State of Florida, hereinafter referred to as the COUNTY, and CARTER <br />ASSOCIATES, INC., (C.A.I.) VERO BEACH, FLORIDA, hereinafter referred to as the ENGINEER, this <br />Work Order No. 3 is an extension of and hereby becomes a part of the MASTER AGREEMENT as follows: <br />s• <br />SECTION I - PROJECT LIMITS AND DESCRIPTION <br />These services will include updating the Vero Lake Estates conceptual master drainage plan <br />(permitted March '97 — July '98) to include the following items in a construction package of plans and <br />specifications to be provided to the County for use in constructing the work. The work will be installed by a <br />combination of County forces and a Contractor selected through a bid process. <br />In addition, CAI will provide technical assistance to the Grant writer, Cape Canaveral Scientific, Inc, in <br />their preparation of a F.D.E.P. Grant application for this project. <br />1. Project work items include: <br />A. Canal A cross section improvements from C.R. 510 to 95"Avenue <br />B. Canal B cross section improvements from C.R. 510 to 94"Avenue <br />C. Construct new 80`" Street canal from Lake Area 20 to 98'" Avenue <br />D. Construct new 86"' Street canal from Lake Susan to 98'h Avenue <br />E. Construct swales and sod per the appropriate typical block grading plan within areas draining to <br />Canal A as listed in item A above. <br />F. Creation or expansion of two lake areas: Lake 20 - A, B, and C; and Lake Oak - A and B. The <br />alteration of water levels in the existing Lake A. <br />G. Overflow structures from these three lake areas, Inflow structures to the Lake 20 area, and to <br />Susan Lake, and one pipe structure to connect Lake 20-A with Lake 20-B. <br />H. A sub -surface, clay or other impervious material, cutoff wall located between Lakes 20-A, B <br />and C and the existing wetlands. <br />I. Concrete control structures at the discharge points from the typical blocks (located North of <br />87t", South of 89'" Street, West of 9I"and East of 94'" Avenues) to the Canal A System. CAI <br />will investigate existing grades in this area to determine the control structure weir elevations. <br />However, the work may not be completed until Phase II due to budget reasons. <br />SECTION II - COUNTY OBLIGATIONS <br />The COUNTY agrees to provide the ENGINEER with the following material, data or services as <br />required in connection with the work to be performed under this Agreement: <br />A. Currently available drainage studies, survey drawings, plans, calculations and other data <br />pertinent to the project. <br />B. Title information and title opinion relating to land necessary for the project. <br />C. Landowner authorizations to inspect and enter onto the site(s). <br />D. Landowner negotiations to acquire permission, easements and/or right-of-way necessary for the <br />project. <br />E. Provide coordination with the Planning Department to determine any project construction <br />requirements including the length of time that may be allowed for the excavation section of the <br />1:\CYN\ENGPROI\IRCStormwtrMgmttmprove\IRC.WORKORDER NO3•VerotlEst.doc Page 1 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.